City Building Permits
Carrabelle, FL Building Permit Guide
How to apply for a building permit in Carrabelle, Florida. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated City of Carrabelle.
- Department
- Building Department
- Address
- 1206 Hwy 98 East, Carrabelle, FL 32322
- Phone
- 850-697-3618
- info@mycarrabelle.com
Online Permit Portal
Platform: iWorQ • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Confirm the parcel is inside the City of Carrabelle.
- Use the city's iWorQ portal or the city development application form, depending on project type.
- Prepare the city application package including parcel information, zoning district, contract cost, heated and unheated square footage, roof material, foundation type, and flood-zone information.
- Submit supporting documents listed on the city checklist: site plan, surveys, building plans, septic information, energy code form, wind load analysis, engineered documents where applicable, and flood-zone forms.
- Wait for permit issuance. Permits are valid for one year and construction must commence within six months.
- Use the city's portal search and inspection functions or city hall contacts to coordinate inspections.
Source: Building Department
General Requirements
Building permits are required for new construction, substantial improvements, and less-than-substantial work.
Required Documents
- Application
- Supplemental application
- Boundary survey for non-flood zones
- Topographical survey
- Site plan
- Septic tank permit
- Energy code form
- 3 complete sets of building plans
- Wind load analysis
- Engineered documents
- Owner-builder affidavit
- Termite affidavit
- Recorded Notice of Commencement
- State permits such as DEP, Corps of Engineers, and FDOT permits
- P&Z approval notice
- BCC approval notice
- Parking plan for applicable projects
- Floodproofing certification if applicable
- Permit validity
- Permit is valid for one year; construction must commence within six months.
- Building code
- Florida Building Code
- Owner-builder
- Owner-builders must provide an affidavit.
- Contractor requirements
- Contractors must be properly licensed and provide appropriate documentation.
Fees
- Permit fee formula
- New residential and commercial construction based on valuation under ICC's current valuation data table, with regional modifier calculated annually.
Fees change. Verify current amounts at the official fee schedule (effective Resolution 02-2020).
Work That Does NOT Require a Permit
Contact the Building Department to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- iWorQ Portal - Search existing permit or request inspection (online)
- 850-697-3618 (phone)
Additional Resources
- Building code: Florida Building Code
- License lookup guide: Florida Contractor License Requirements
- Contract template: Florida Homeowner-Contractor Agreement
- Florida hub: Florida Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department before applying.
Need help with your project?
Navigating permits in Carrabelle can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Franklin County
View all Franklin County jurisdictions →