County Building Permits

Dixie County Building Permit Guide (Unincorporated Area)

How to apply for a building permit in unincorporated Dixie County, Florida. Permit authority, application steps, fees, and inspection requirements.

Florida Updated March 2026

Permit Authority

All properties in unincorporated Dixie County not within the Town of Cross City or Town of Horseshoe Beach.

Department
Dixie County Community Development / Building and Zoning
Address
387 SE 22 Ave, Cross City, FL 32628
Phone
352-498-1235

Online Permit Portal

Application Process

  1. Confirm the parcel is in unincorporated Dixie County rather than inside the Town of Cross City or the Town of Horseshoe Beach.
  2. Use the county's iWorQ portal or download the PDF application package for the project type.
  3. Upload or deliver the supporting documents listed on the county portal or checklist.
  4. Record a Notice of Commencement when Florida law requires it and provide the recorded document before the first inspection.
  5. Wait for county review and permit issuance before starting work.
  6. Request inspections through the county inspection portal and obtain final approval.

Source: Dixie County Community Development / Building and Zoning

General Requirements

A building permit is required for all construction in unincorporated Dixie County.

Required Documents

  • Warranty deed
  • Signed survey
  • 911 address verification
  • Site plan to scale
  • Septic tank permit or letter from sewer company
  • Signed application
  • Recorded Notice of Commencement
  • Engineered plans marked 130 mph
  • Truss engineering marked 130 mph
  • Product approval paper
  • Driveway approval before final power release
Building code
2023 Florida Building Code, 8th Edition (effective December 31, 2023)
Contractor requirements
Separate permits must be secured for electrical, plumbing, mechanical, roofing, gas, and similar trade work.

Fees

Payment note
Contact Dixie County Building and Zoning at 352-498-1235 to confirm current permit, plan review, reinspection, and trade permit charges.

Work That Does NOT Require a Permit

Contact the Dixie County Community Development / Building and Zoning to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

Inspection hours
Monday-Friday, 8:00 AM to 12:00 PM and 1:00 PM to 5:00 PM

Typical inspection sequence: County inspection menu includes foundations, framing, sheathing, roofing, rough and final trade inspections, seawall, pool, shed/carport, mobile home, floodplain management, and zoning-related entries.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Dixie County Community Development / Building and Zoning before applying.

Need help with your project?

Navigating permits in Unincorporated Dixie County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Dixie County permit guides