City Building Permits

Town of Frederick, COLORADO Building Permit Guide

How to apply for a building permit in Town of Frederick, Colorado. Permit authority, application steps, fees, and inspection requirements.

Colorado Weld County Updated March 2026

Permit Authority

Applies within Frederick town limits. The town handles building permits directly and also requires coordination with outside entities such as St. Vrain Sanitation District and, for some projects, school district fee obligations.

Department
Town of Frederick Building Department
Address
401 Locust Street, Frederick, CO 80530
Phone
720-382-5605

Online Permit Portal

Platform: Accela Citizen Access • Account required: Yes • Submission: In-person only

Application Process

  1. Review the Town of Frederick permit or home improvement guidance to determine whether the project requires a permit.
  2. Select the correct application form, such as new residential, new commercial, or general permit application.
  3. Submit the application package with required plans and submittal materials through the town process and Accela portal.
  4. Provide any required outside-agency items, such as proof of sewer tap purchase from St. Vrain Sanitation District where applicable.
  5. Pay permit and plan review fees under the town fee schedule.
  6. Receive the issued permit and maintain approved plans and required letters on site.
  7. Schedule required inspections and complete all final building, electrical, mechanical, plumbing, engineering, and planning signoffs as applicable.

Typical processing time: No general review turnaround was clearly published on the main public pages reviewed.

Source: Town of Frederick Building Department

General Requirements

Frederick publishes permit triggers for additions, enclosed patios, basement finishes, detached garages, pole barns, re-roofs, decks and porches, and covered patios or carports.

Required Documents

  • New residential, new commercial, and general permit applications
  • Submittal requirements
  • Building code requirements
  • Residential new construction checklist
  • Project-specific required letters
  • Grading certificate
  • HERS report
  • ILC
  • Insulation certificate
  • Setback certificate
Permit validity
Not clearly stated on the public pages reviewed.
Building code
Frederick publishes a Building Codes page, but the exact current code cycle was not summarized in the text captured from the public pages reviewed.
Owner-builder
Not clearly summarized on the main public pages reviewed.
Contractor requirements
Frederick maintains a contractor license page through the Building Department.

Fees

Minimum permit fee
Not clearly stated in the main page text reviewed
Plan check fee
The 2026 fee schedule includes a plan review charge of $1,000 per $500,000 or fraction thereof of total building valuation for commercial plan review.
Permit fee formula
The 2026 fee schedule includes building permit fee items and project valuation-based components.
Reinspection fee
See current fee schedule; the home improvement page does not summarize one concise reinspection rule.
Payment note
Not clearly stated on the main public pages reviewed.

Fees change. Verify current amounts at the official fee schedule (effective 2026).

Work That Does NOT Require a Permit

  • One-story detached accessory structures with floor area not exceeding 200 square feet
  • Fences not over 6 feet high
  • Retaining walls not over 4 feet high unless supporting a surcharge
  • Sidewalks and driveways not more than 30 inches above adjacent grade and not over a basement or story below
  • Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
  • Prefabricated swimming pools less than 24 inches deep
  • Swings and similar playground equipment accessory to a one or two-family dwelling
  • Portable heating, cooking, or clothes drying appliances
  • Minor electrical, mechanical, and plumbing items

Inspections

How to Schedule

  • 720-382-5620 (phone)
Inspection hours
Building Department hours are Monday through Friday, 7:30 a.m. to 4:30 p.m.

Typical inspection sequence: Frederick publishes required inspections for new residential work including footing, foundation, open hole, rough framing, rough trade inspections, insulation, drywall, exterior wall or weather barrier items, finals, and final engineering and planning approvals.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Frederick Building Department before applying.

Need help with your project?

Navigating permits in Town of Frederick can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Weld County

View all Weld County jurisdictions →