City Building Permits

Manitou Springs, COLORADO Building Permit Guide

How to apply for a building permit in Manitou Springs, Colorado. Permit authority, application steps, fees, and inspection requirements.

Colorado El Paso County Updated March 2026

Permit Authority

Manitou Springs uses a two-layer system. City requires Property Improvement Permit and use tax process for almost all improvements; issues use tax ID needed to pull PPRBD building permit. For structural/electrical/plumbing/mechanical work, PPRBD handles building permit and inspections.

Department
City of Manitou Springs Planning Department for Property Improvement Permits and use tax; Pikes Peak Regional Building Department for structural, electrical, plumbing, and mechanical permits
Address
City Planning: 606 Manitou Avenue, Manitou Springs, CO 80829; PPRBD: 2880 International Circle, Colorado Springs, CO 80910
Phone
Planning: 719-685-4398; City: 719-685-5481; PPRBD: 719-327-2880

Online Permit Portal

Platform: CivicPlus Planning Forms • Account required: No • Submission: In-person only

Application Process

  1. Review city FAQ and determine whether Property Improvement Permit is required.
  2. Check zoning and historic district status using city's zoning map and historic sub-district map.
  3. Submit Property Improvement Permit application online, by email, or in person with PDF plans.
  4. Planning Department reviews and contacts applicant for payment.
  5. City issues Property Improvement Permit and use tax ID number after payment received.
  6. Use ID number to pull required PPRBD building permit for structural/electrical/plumbing/mechanical work.
  7. Submit PPRBD permit or ePlan materials, obtain issuance, and complete inspections.

Typical processing time: No current standard review time found on city's public-facing permit pages.

Source: City of Manitou Springs Planning Department for Property Improvement Permits and use tax; Pikes Peak Regional Building Department for structural, electrical, plumbing, and mechanical permits

General Requirements

Manitou Springs states almost all improvements require Property Improvement Permit. Construction involving structural, electrical, plumbing, or mechanical work also requires PPRBD permit.

Required Documents

  • Completed Property Improvement Permit application
  • PDF plans and construction material information when applicable
  • Historic district location and zoning designation documents
  • Site plan materials
  • PPRBD permit and plan materials for building permit component
Permit validity
City pages don't clearly publish standard expiration for Property Improvement Permit. PPRBD's 6-month administrative closure and 1-year voiding rules apply to building permit layer.
Building code
Manitou Springs participates in 2023 Pikes Peak Regional Building Code through PPRBD. City applies Land Use and Development Code and historic district review. Appendix F contains adoption ordinance.
Owner-builder
PPRBD homeowner rules apply to building permit layer; limited to owner-occupied primary residences.
Contractor requirements
PPRBD contractor licensing applies for building permit layer. City emphasizes contacting Planning before work; no separate city contractor license requirement clearly published.

Fees

Minimum permit fee
$35 Manitou minimum; $50 PPRBD
Plan check fee
Manitou fee schedule includes city-side review fees; PPRBD plan examination is 28% of building permit fee
Permit fee formula
Manitou fee schedule charges by permit type and valuation brackets. City use tax 3.8% of material cost (not labor). PPRBD separately charges valuation-based or flat building permit fees.
Reinspection fee
$50 first, $100 second, $200 third plus 2-day delay
Penalty (no permit)
Work without permit: 2 times the permit fee
Payment note
City issues permit and use tax ID only after payment received. Accepts cash, check, or credit/debit card; cash and check in person only; card payments in person or by phone.

Fees change. Verify current amounts at the official fee schedule (effective July 1, 2020 for use tax; current for other fees).

Work That Does NOT Require a Permit

  • City states almost all improvements require Property Improvement Permit
  • For regional building permit layer, PPRBD exempt-work categories apply

Important: Applicants should not assume exemption from Manitou city permit or historic review without Planning confirmation.

Inspections

How to Schedule

Scheduling deadline
Same-day requests weekdays from 7:30 AM to 8:30 AM
Inspection hours
Estimated arrival after 9:00 AM

Typical inspection sequence: For PPRBD permit work, includes footing, foundation, framing, rough trade, insulation, and final. Manitou city permit is front-loaded as prerequisite and use tax clearance step before PPRBD permit.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Manitou Springs Planning Department for Property Improvement Permits and use tax; Pikes Peak Regional Building Department for structural, electrical, plumbing, and mechanical permits before applying.

Need help with your project?

Navigating permits in Manitou Springs can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in El Paso County

View all El Paso County jurisdictions →