City Building Permits

Town of Prescott Valley, AZ Building Permit Guide

How to apply for a building permit in Town of Prescott Valley, Arizona. Permit authority, application steps, fees, and inspection requirements.

Arizona Yavapai County Updated March 2026

Permit Authority

All properties within the incorporated Town of Prescott Valley.

Department
Town of Prescott Valley Development Services - Permits

Online Permit Portal

Platform: GoPost • Account required: Yes • Submission: Online only

Additional resources:

Application Process

  1. Obtain applicable permit application packet and forms.
  2. Complete building permit application, plot plan, and required documents.
  3. Ensure documents are signed, dated, and include clear contact information.
  4. Submit through GoPost online submittal system.
  5. Town processes application and provides review timeline.
  6. Respond to any comments or requests for corrections.
  7. Obtain permit upon approval.

Typical processing time: Varies by project type; GoPost provides current timelines.

Source: Town of Prescott Valley Development Services - Permits

General Requirements

Prescott Valley Town Code section 7-01-140 requires a permit for all buildings, structures, or building service equipment, including fences, retaining walls, fireplaces, wood stoves, and gas/electric/solid-fuel appliances.

Required Documents

  • Completed building permit application
  • Plot plan
  • Signed and dated documents
  • Clear contact information
Permit validity
Permit applications are deemed abandoned after 180 days unless pursued in good faith or a permit is issued. The building official may grant one written extension of up to 180 days.
Building code
2018 IBC, 2018 IRC, 2018 IMC, 2017 NEC

Work That Does NOT Require a Permit

  • One-story detached accessory buildings up to 144 square feet for one- and two-family dwellings
  • Masonry or concrete fences up to 4 feet in height
  • Wood or other fences up to 6 feet in height
  • Certain low retaining walls
  • Oil derricks
  • Some movable counters and partitions

Important: Exempt from building permit does not mean exempt from zoning requirements. Separate zoning permits can still be required.

Inspections

How to Schedule

  • IVR System: 928-759-3060 (phone)
Scheduling deadline
Inspection requests must be called in before 6:30 AM for same-day inspection and may be scheduled up to five working days in advance.
Inspection hours
Monday-Friday

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Prescott Valley Development Services - Permits before applying.

Need help with your project?

Navigating permits in Town of Prescott Valley can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.