Town of Taylor, AZ Building Permit Guide

How to apply for a building permit in Town of Taylor, Arizona. Permit authority, application steps, fees, and inspection requirements.

Arizona Navajo County Updated March 2026

Permit Authority

All properties within the incorporated Town of Taylor.

Department
Town of Taylor Building Department
Address
425 Papermill Road, Taylor, AZ 85939
Phone
928-536-7366

Online Permit Portal

Platform:Account required: No • Submission: In-person only

Additional resources:

Application Process

  1. Identify your property address and parcel number.
  2. Determine if your work requires a permit.
  3. Prepare two sets of plans for new homes and many remodels.
  4. Gather owner information and contractor information if applicable.
  5. Submit permit application with required documents to Town of Taylor Building Department.
  6. Plan review takes up to two weeks for one- and two-family dwellings.
  7. Obtain permit upon approval.
  8. Work may begin only after permit issuance and return of approved plans.
  9. Schedule inspections with at least 24 hours' notice.

Typical processing time: Plan review for one- and two-family dwellings generally takes up to two weeks.

Source: Town of Taylor Building Department

General Requirements

A building permit is issued by the Building Department for various categories of work including additions, demolition or movement of carports, garages, or sheds over 200 square feet, attic/garage/basement conversions, new door and window openings, wall changes, certain reroofing, stairways, retaining walls over 4 feet, elevated decks, and fences over 7 feet.

Required Documents

  • Property address and parcel number
  • Description of work
  • Owner information
  • Contractor information (if applicable)
  • Two sets of plans for new homes and many remodels
Permit validity
Timeframe not specified; contact town for details.
Building code
Adopted code edition not specified; contact town for current adopted codes.

Fees

Payment note
Permit fees payable at Town Hall after approval.

Work That Does NOT Require a Permit

Contact the Town of Taylor Building Department to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • 928-536-7366 (phone)
Scheduling deadline
Inspections required with at least 24 hours' notice.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Taylor Building Department before applying.

Need help with your project?

Navigating permits in Town of Taylor can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.