City Building Permits
Town of Clifton, AZ Building Permit Guide
How to apply for a building permit in Town of Clifton, Arizona. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated Town of Clifton.
- Department
- Building Department / Code Enforcement
- Address
- Town Hall, 510 Coronado Boulevard, Clifton, AZ 85533
- Phone
- (928) 322-7913
Online Permit Portal
Platform: MyGov • Account required: Yes • Submission: Online only
Application Process
- Review Clifton's exempt work categories and determine if your project requires a building permit.
- Download the residential permit checklist and building permit application from the town website.
- Prepare all required scaled drawings including site plan, footing and foundation plan, floor plan, framing plans, elevations, electrical plans, and plumbing information.
- Create a MyGov account and submit permit application with all required documents online.
- Town staff reviews the application for completeness and permits.
- Contact the Building Inspector at least two days before inspections are needed.
- Receive permit approval and proceed with construction.
Typical processing time: Varies; consult with Building Inspector for specific project timeline.
General Requirements
A building permit is required for any construction, alteration, repair, or demolition within the Town of Clifton unless the work falls within listed exemptions.
Required Documents
- Completed building permit application
- Site plan (scaled)
- Footing and foundation plan
- Floor plan
- Framing plans
- Elevations
- Electrical plans
- Plumbing information
- Building code
- 2009 International Building Code
Fees
- Permit fee formula
- Consult with town for current building permit fees and plan review charges.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Storage structures not over 200 square feet
- Fences not over 6 feet in height
- Retaining walls not over 4 feet
- Sidewalks and driveways
- Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Certain window awnings
- Decks not over 200 square feet and not more than 30 inches above grade
- Portable heating, ventilation, or cooling units
- Replacement of minor parts that do not alter equipment approval or make equipment unsafe
Important: Exempt from building permit does not mean exempt from other town requirements or codes. Confirm edge cases with the Building Department before proceeding.
Inspections
How to Schedule
- (928) 322-7913 (phone)
- Scheduling deadline
- Notify building inspector at least two days before inspection is needed.
- Inspection hours
- Monday through Thursday, 7:00 AM to 5:00 PM
Additional Resources
- Building code: 2009 International Building Code
- Verify contractor license: Arizona Registrar of Contractors
- Residential Permit Checklist
- License lookup guide: Arizona Contractor License Requirements
- Contract template: Arizona Homeowner-Contractor Agreement
- Arizona hub: Arizona Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department / Code Enforcement before applying.
Need help with your project?
Navigating permits in Town of Clifton can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.