City Building Permits
Town of Afton, WY - 2026 Building Permit Guide
How to apply for a building permit in Town of Afton, Wyoming. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Covers the incorporated town limits of Afton (population approximately 1,900). Afton is the regional service center for Star Valley and experiences more active permit volume than other small Lincoln County municipalities due to growth from second-home and resort development.
- Department
- Town of Afton -- Building/Planning Department
- Address
- 150 North Washington, Afton, WY 83110
- Phone
- (307) 885-3106
- Website
- https://www.aftonwyoming.org
Online Permit Portal
Platform: • Account required: No • Submission: In-person only
Application Process
- Contact Afton Town Hall at (307) 885-3106 to confirm current permit application process and obtain appropriate forms
- Prepare a site plan showing parcel boundaries, setbacks, existing structures, and proposed project
- Submit completed application, site plan, construction drawings, and fee to Town Hall
- Town staff review for zoning compliance and applicable code standards
- Permit issued; post on job site
- Schedule inspections with Town Hall
- Final inspection and completion/occupancy documentation
Typical processing time: Not published. Call for current workload estimate.
General Requirements
New construction, additions, structural alterations, and manufactured home placement
Required Documents
- Permit application
- Site plan
- Construction drawings
- Trade permits as applicable
- Building code
- Not confirmed from public sources. Wyoming's lack of mandatory statewide residential code means Afton may have adopted the IRC by ordinance or may operate under local construction standards. Confirm with town hall.
- Contractor requirements
- No general contractor license required at state level. All electrical work requires state electrical license; all plumbing requires state plumbing license.
Work That Does NOT Require a Permit
- Agricultural exemptions may apply to qualifying agricultural structures on parcels at the town fringe or outside the core urban area
Important: Confirm with Afton Town Hall whether agricultural use exemptions apply within the incorporated limits
Inspections
How to Schedule
- ()
- Scheduling deadline
- Provide at least 24-48 hours advance notice. The town's inspection staff may be limited, and scheduling windows may not be available every day.
- Inspection hours
- Monday through Friday, 8:00 am to 5:00 pm
Typical inspection sequence: Typical sequence for single-family residential: Foundation/footing (pre-pour), framing (after rough framing, before sheathing), rough-in mechanical and plumbing, rough electrical (state inspector only), insulation (if required), final building inspection
Rough electrical inspections are by state electrical inspector only, not a town inspection. State plumbing inspector if licensed plumbing contractor is not self-inspecting.
Additional Resources
- Building code: Not confirmed from public sources. Wyoming's lack of mandatory statewide residential code means Afton may have adopted the IRC by ordinance or may operate under local construction standards. Confirm with town hall.
- Wyoming Electrical Board
- Wyoming State Plumbing Board
- FEMA Flood Map Service Center
- License lookup guide: Wyoming Contractor License Requirements
- Contract template: Wyoming Homeowner-Contractor Agreement
- Wyoming hub: Wyoming Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Afton -- Building/Planning Department before applying.
Frequently Asked Questions
Town of Afton Building Permit FAQ
- Do I need a building permit in Town of Afton, WY?
- New construction, additions, structural alterations, and manufactured home placement
- How do I apply for a building permit in Town of Afton, WY?
- 1. Contact Afton Town Hall at (307) 885-3106 to confirm current permit application process and obtain appropriate forms 2. Prepare a site plan showing parcel boundaries, setbacks, existing structures, and proposed project 3. Submit completed application, site plan, construction drawings, and fee to Town Hall 4. Town staff review for zoning compliance and applicable code standards 5. Permit issued; post on job site 6. Schedule inspections with Town Hall 7. Final inspection and completion/occupancy documentation
- How long does it take to get a building permit in Town of Afton, WY?
- Typical processing time is Not published. Call for current workload estimate..
- What work is exempt from building permits in Town of Afton, WY?
- The following work is generally exempt: Agricultural exemptions may apply to qualifying agricultural structures on parcels at the town fringe or outside the core urban area. Note: Confirm with Afton Town Hall whether agricultural use exemptions apply within the incorporated limits
- How do I schedule a building inspection in Town of Afton, WY?
- Inspections can be scheduled via: . Provide at least 24-48 hours advance notice. The town's inspection staff may be limited, and scheduling windows may not be available every day..
Need help with your project?
Navigating permits in Town of Afton can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Lincoln County
View all Lincoln County jurisdictions →