St Croix County, WI - 2026 Building Permit Guide

How to apply for a building permit in unincorporated St Croix County, Wisconsin. Permit authority, application steps, fees, and inspection requirements.

Wisconsin Updated March 2026

Permit Authority

All unincorporated areas of St. Croix County (towns not listed as having their own zoning: Eau Galle, Warren, Hammond, Baldwin, Springfield, Troy, Kinnickinnic, Pleasant Valley, Rush River, Cady, St. Joseph, Richmond, Erin Prairie, Emerald, Glenwood, Somerset, Star Prairie, Stanton, Cylon, Forest)

Department
Address
1101 Carmichael Road, Suite 1300, Hudson, WI 54016
Phone
715-386-4680

Application Process

  1. Obtain a Land Use Permit Application (available at https://www.sccwi.gov/DocumentCenter/View/495/Land-Use-Permit-Application-PDF)
  2. Submit completed application with required documents
  3. Processing time: Typically 5-7 business days
  4. Obtain sanitary permit before building permit if plumbing involved
  5. Submit building permit application with approved land use permit
  6. Inspections scheduled upon approval

General Requirements

Work That Does NOT Require a Permit

  • Building equipment repairs/replacement without structural alterations (furnaces, water heaters, AC units)
  • Restoration or repair to previous code-compliant condition as determined by building inspector
  • Maintenance work such as shingling or residing a house
  • Improvements under $2,000-$5,000 (varies by town)
  • Replacement roofing, siding, and/or window/door of same size without structural modifications

Inspections

How to Schedule

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the before applying.

Frequently Asked Questions

St Croix County Building Permit FAQ

How do I apply for a building permit in unincorporated St Croix County, WI?
1. Obtain a Land Use Permit Application (available at https://www.sccwi.gov/DocumentCenter/View/495/Land-Use-Permit-Application-PDF) 2. Submit completed application with required documents 3. Processing time: Typically 5-7 business days 4. Obtain sanitary permit before building permit if plumbing involved 5. Submit building permit application with approved land use permit 6. Inspections scheduled upon approval
What work is exempt from building permits in unincorporated St Croix County, WI?
The following work is generally exempt: Building equipment repairs/replacement without structural alterations (furnaces, water heaters, AC units); Restoration or repair to previous code-compliant condition as determined by building inspector; Maintenance work such as shingling or residing a house; Improvements under $2,000-$5,000 (varies by town); Replacement roofing, siding, and/or window/door of same size without structural modifications.

Need help with your project?

Navigating permits in ST. CROIX COUNTY (UNINCORPORATED AREA) can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to St Croix County permit guides