County Building Permits

Spokane County, WA - 2026 Building Permit Guide

How to apply for a building permit in unincorporated Spokane County, Washington. Permit authority, application steps, fees, and inspection requirements.

Washington Updated March 2026

Permit Authority

All properties in unincorporated Spokane County, Town of Rockford, and Town of Spangle.

Department
Spokane County Building & Planning
Address
1026 W Broadway Ave, Spokane, WA 99260
Phone
(509) 477-3675

Online Permit Portal

Platform: SmartGov Community • Account required: Yes • Submission: Online only

Application Process

  1. Use Spokane County Interactive Map to confirm your property is in unincorporated County jurisdiction.
  2. Create account on SmartGov Community portal.
  3. Submit application online with all required documents.
  4. Gather required information: Parcel number, legal description, street address (if assigned), site plan, foundation plans, structural details.
  5. Project Coordinator contacts applicant via email when fees are ready to be paid.
  6. Pay processing and plan review fees prior to permit application being routed for review (effective July 1, 2025).
  7. Application routed for review after fees are paid.
  8. Request inspections online at www.spokanecounty.org/permits or by phone at (509) 477-3675.

Typical processing time: Processing time varies by project complexity; contact County for estimates.

Source: Spokane County Building & Planning

General Requirements

A building permit is required for all construction in unincorporated Spokane County.

Required Documents

  • Parcel number of proposed site
  • Legal description of proposed site (from property tax statement or County Assessor)
  • Street address (assigned at permit application if none exists)
  • Site plan
  • Foundation plans, floor plans, elevations, cross sections, structural details (minimum 11x17, 1/8-inch scale)
  • Truss and beam specifications
  • Footing calculations
  • Mechanical and ventilation forms
  • Washington State Energy Code compliance forms
Permit validity
Governed by International Codes.
Building code
2021 International Building Code, International Residential Code, International Mechanical Code, International Fire Code, Uniform Plumbing Code with Washington State amendments
Owner-builder
Owner-builders must comply with Washington State L&I registration and County requirements.
Contractor requirements
Washington State L&I registration required.

Work That Does NOT Require a Permit

Contact the Spokane County Building & Planning to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

Scheduling deadline
Contact County for inspection request procedures.
Inspection hours
Monday-Friday during business hours
Time windows
Inspection timing varies.

Typical inspection sequence: Required inspections: Foundation, framing, mechanical, plumbing, electrical (through WA State L&I), final.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Spokane County Building & Planning before applying.

Frequently Asked Questions

Spokane County Building Permit FAQ

Do I need a building permit in unincorporated Spokane County, WA?
A building permit is required for all construction in unincorporated Spokane County.
How do I apply for a building permit in unincorporated Spokane County, WA?
1. Use Spokane County Interactive Map to confirm your property is in unincorporated County jurisdiction. 2. Create account on SmartGov Community portal. 3. Submit application online with all required documents. 4. Gather required information: Parcel number, legal description, street address (if assigned), site plan, foundation plans, structural details. 5. Project Coordinator contacts applicant via email when fees are ready to be paid. 6. Pay processing and plan review fees prior to permit application being routed for review (effective July 1, 2025). 7. Application routed for review after fees are paid. 8. Request inspections online at www.spokanecounty.org/permits or by phone at (509) 477-3675.
How long does it take to get a building permit in unincorporated Spokane County, WA?
Typical processing time is Processing time varies by project complexity; contact County for estimates..
What work is exempt from building permits in unincorporated Spokane County, WA?
The following work is generally exempt: Residential accessory buildings: Single story and less than 200 square feet; Other exemptions per adopted International Codes. Note: Note: Fences over 6 feet in height require building permits in unincorporated Spokane County.
How do I schedule a building inspection in unincorporated Spokane County, WA?
Inspections can be scheduled via: Online portal at www.spokanecounty.org/permits, (509) 477-3675. Contact County for inspection request procedures..

Need help with your project?

Navigating permits in Unincorporated Spokane County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Spokane County permit guides