Town of Floyd, VA - 2026 Building Permit Guide

How to apply for a building permit in Town of Floyd, Virginia. Permit authority, application steps, fees, and inspection requirements.

Virginia Floyd County Updated March 2026

Permit Authority

The Town of Floyd is an incorporated town within Floyd County. The town handles zoning permits, rezoning, conditional use, sign, banner, and temporary-sign approvals within town limits. Floyd County Building Inspections remains the building official and issues building permits for in-town projects.

Department
Town of Floyd Zoning Administrator
Address
203 E Oxford Street, Floyd, VA 24091
Phone
(540) 745-2565

Online Permit Portal

Platform: Town website forms page with downloadable PDF applications; no dedicated online permit portal identified • Account required: No • Submission: In-person only

Application Process

  1. Confirm that the property is inside Town of Floyd limits. If the project involves building construction, alteration, or occupancy, both a town zoning path and Floyd County building-code review are required.
  2. For a permitted use or alteration, submit a zoning permit application to the town zoning administrator with two copies of an acceptable site plan showing lot dimensions, existing and proposed structures, yard dimensions, easements, watercourses, fences, street and right-of-way lines, driveways, and parking areas.
  3. For a conditional use permit, submit the application and site plan to the zoning administrator. The application is referred to the Planning Commission for recommendation, then to Town Council for public hearing and decision.
  4. For a rezoning or map amendment, submit the written application and site plan to the zoning administrator. The Planning Commission and Town Council public-hearing process applies.
  5. Coordinate with Floyd County Building Inspections for building-code review, permit issuance, and inspections. The county building office is at (540) 745-9359.
  6. After zoning approval and county building review, obtain the zoning permit or conditional use permit. Before occupancy, obtain the certificate of occupancy co-signed by the zoning administrator and building official.

Typical processing time: Zoning administrator action on a permitted-use zoning permit: 45 days after receipt, extendable by written notice for another 45 days; failure to act within the stated period is deemed approval. Conditional use: Town Council must take action within 30 days from the public hearing after Planning Commission review.

Source: Town of Floyd Zoning Administrator

General Requirements

The town zoning ordinance requires a zoning permit for any permitted use or alteration of land or structures within town limits. A certificate of occupancy is required before occupancy of a new building, a building altered so as to affect height or required yards, or a change in occupancy or use.

Required Documents

  • Completed town application form
  • Two copies of an acceptable site plan for zoning permits, conditional uses, and rezonings
  • For rezoning or conditional use applications, list of adjoining property owners with addresses and tax parcel numbers
  • Sketches showing property boundaries, existing zoning and land use, existing structures, and proposed structures or signs
  • Appropriate fee where applicable
  • VDOT application and permit for banners per the town banner form
  • Any required county building, Health Department, VDOT, floodplain, erosion and sediment, or Public Service Authority approvals
Permit validity
Any zoning permit automatically expires 6 months after issuance if not being exercised for its intended purpose, or if the authorized work is suspended or discontinued for 1 year. Conditional use permits must be put into effect within 6 months unless the permit says otherwise. Conditional use permits expire on the last day of the Town of Floyd fiscal year.
Building code
The town ordinance requires compliance with the Virginia Statewide Uniform Building Code as part of zoning-permit review and certificate-of-occupancy issuance.
Owner-builder
No town-specific owner-builder rule was identified in public-facing town zoning materials. Building permit and contractor licensing matters remain under Floyd County and state law.
Contractor requirements
No separate town contractor-license rule was identified in the zoning and sign materials reviewed. Virginia DPOR contractor licensing requirements apply to county-issued building permits and trade permits.

Fees

Permit fee formula
Public town forms indicate flat application fees rather than valuation-based formulas. Fee amounts were not filled in on public forms and no separate fee schedule was found.
Penalty (no permit)
Penalty for failure to comply with a conditional use permit after notice: $50.00 per calendar month.
Payment note
No online payment portal was identified. Payment is handled through the town office as part of application intake.

Work That Does NOT Require a Permit

Contact the Town of Floyd Zoning Administrator to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • Floyd County Building Inspections: (540) 745-9359 (phone)
Scheduling deadline
Floyd County requires 24 hours advance notice for all inspections. No same-day inspections are made.
Inspection hours
Town office: Monday through Friday, 8:30 a.m. to 4:30 p.m. County building office: Monday through Friday, 8:00 a.m. to 4:30 p.m.

Typical inspection sequence: Building inspections for in-town projects are performed by Floyd County Building Inspections. The town zoning administrator may inspect premises and co-signs certificates of occupancy with the county building official.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Floyd Zoning Administrator before applying.

Frequently Asked Questions

Town of Floyd Building Permit FAQ

Do I need a building permit in Town of Floyd, VA?
The town zoning ordinance requires a zoning permit for any permitted use or alteration of land or structures within town limits. A certificate of occupancy is required before occupancy of a new building, a building altered so as to affect height or required yards, or a change in occupancy or use.
How much does a building permit cost in Town of Floyd, VA?
Fees are calculated as: Public town forms indicate flat application fees rather than valuation-based formulas. Fee amounts were not filled in on public forms and no separate fee schedule was found..
How do I apply for a building permit in Town of Floyd, VA?
1. Confirm that the property is inside Town of Floyd limits. If the project involves building construction, alteration, or occupancy, both a town zoning path and Floyd County building-code review are required. 2. For a permitted use or alteration, submit a zoning permit application to the town zoning administrator with two copies of an acceptable site plan showing lot dimensions, existing and proposed structures, yard dimensions, easements, watercourses, fences, street and right-of-way lines, driveways, and parking areas. 3. For a conditional use permit, submit the application and site plan to the zoning administrator. The application is referred to the Planning Commission for recommendation, then to Town Council for public hearing and decision. 4. For a rezoning or map amendment, submit the written application and site plan to the zoning administrator. The Planning Commission and Town Council public-hearing process applies. 5. Coordinate with Floyd County Building Inspections for building-code review, permit issuance, and inspections. The county building office is at (540) 745-9359. 6. After zoning approval and county building review, obtain the zoning permit or conditional use permit. Before occupancy, obtain the certificate of occupancy co-signed by the zoning administrator and building official.
How long does it take to get a building permit in Town of Floyd, VA?
Typical processing time is Zoning administrator action on a permitted-use zoning permit: 45 days after receipt, extendable by written notice for another 45 days; failure to act within the stated period is deemed approval. Conditional use: Town Council must take action within 30 days from the public hearing after Planning Commission review..
How do I schedule a building inspection in Town of Floyd, VA?
Inspections can be scheduled via: Floyd County Building Inspections: (540) 745-9359. Floyd County requires 24 hours advance notice for all inspections. No same-day inspections are made..

Need help with your project?

Navigating permits in Town of Floyd can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.