Town of Cleveland, UT - 2026 Building Permit Guide
How to apply for a building permit in Town of Cleveland, Utah. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Cleveland town limits. Town handles zoning; Emery County B&Z handles building permit issuance and inspections.
- Department
- Cleveland Town Office
- Address
- 130 West Main Street, Cleveland, UT 84518
- Phone
- (435) 653-2310
- Website
- http://www.clevelandtown.org/
Application Process
- Contact Cleveland Town Office at (435) 653-2310 or visit at 130 West Main Street to initiate the permit process.
- Download or pick up building permit forms and checklists from the town's building permit information page.
- Obtain zoning clearance from the town.
- Submit county building permit application with zoning clearance and required documents to Emery County B&Z.
- Pay permit fees.
- Await plan review and approval.
- Receive issued permit and post on job site.
- Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice.
- Pass final inspection and receive Certificate of Occupancy.
- Note: Planning and Zoning Commission meetings are held at the public safety building at 130 W. Main, Cleveland at 7:00 PM.
Typical processing time: 24 hours to several weeks depending on complexity
Source: Cleveland Town Office
General Requirements
Same county baseline applies within Cleveland town limits. Town zoning clearance is required before county permit issuance.
Required Documents
- Town zoning clearance
- County building permit application
- Site plan and construction drawings
- Owner-builder certification or contractor license information
- Permit validity
- 180 days to commence; 180 days without suspension.
- Building code
- 2021 code suite per Utah Title 15A: IBC 2021, IRC 2021, IMC 2021, IPC 2021, IFGC 2021, NEC 2020, IECC 2021, Existing Building Code 2021, Utah Wildland Urban Interface Code.
- Owner-builder
- Same statewide rules apply per Utah Code Section 58-55-305.
- Contractor requirements
- Utah DOPL license required for work at $3,000 or more.
Fees
- Minimum permit fee
- $50
- Permit fee formula
- Project valuation
Fees change. Verify current amounts at the official fee schedule (effective 2025).
Work That Does NOT Require a Permit
- Detached accessory structures with floor area of 200 sq ft or less
- Fences not over 7 feet high
- Oil derricks
- Retaining walls not over 4 feet in height
- Water tanks supported directly on grade, not exceeding 5,000 gallons
- Sidewalks and driveways not more than 30 inches above adjacent grade
- Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work
- Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground
- Swings and playground equipment accessory to detached one- and two-family dwellings
- Window awnings supported by exterior wall
- Agricultural shade cloth structures
Important: Same as county. Exemption from permit does not authorize violation of adopted codes.
Inspections
How to Schedule
- (435) 381-5374 (phone)
- Scheduling deadline
- 24 to 48 hours advance notice required
- Inspection hours
- Monday through Friday, 8:30 AM to 5:00 PM
Typical inspection sequence: Same as county: footing/foundation reinforcement, rebar, under-concrete floor inspection, stitch and lag pier (manufactured homes), rough framing, rough plumbing, rough electrical, rough mechanical, insulation, power to panel, notification for exterior finishes/roofing/fireplace, rough drywall, gas line pressure test, masonry, final inspection.
Do not cover or conceal any work that requires inspection.
Additional Resources
- Building code: 2021 code suite per Utah Title 15A: IBC 2021, IRC 2021, IMC 2021, IPC 2021, IFGC 2021, NEC 2020, IECC 2021, Existing Building Code 2021, Utah Wildland Urban Interface Code.
- Verify contractor license: Utah DOPL Contractor Licensing
- Zoning information: View zoning info
- Cleveland zoning map
- Town website
- Building permit information and forms
- Planning and Zoning
- Town office contact
- Town office page
- License lookup guide: Utah Contractor License Requirements
- Contract template: Utah Homeowner-Contractor Agreement
- Utah hub: Utah Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Cleveland Town Office before applying.
Frequently Asked Questions
Town of Cleveland Building Permit FAQ
- Do I need a building permit in Town of Cleveland, UT?
- Same county baseline applies within Cleveland town limits. Town zoning clearance is required before county permit issuance.
- How much does a building permit cost in Town of Cleveland, UT?
- The minimum permit fee is $50. Fees are calculated as: Project valuation.
- How do I apply for a building permit in Town of Cleveland, UT?
- 1. Contact Cleveland Town Office at (435) 653-2310 or visit at 130 West Main Street to initiate the permit process. 2. Download or pick up building permit forms and checklists from the town's building permit information page. 3. Obtain zoning clearance from the town. 4. Submit county building permit application with zoning clearance and required documents to Emery County B&Z. 5. Pay permit fees. 6. Await plan review and approval. 7. Receive issued permit and post on job site. 8. Schedule inspections through county B&Z at (435) 381-5374 with 24 to 48 hours advance notice. 9. Pass final inspection and receive Certificate of Occupancy. 10. Note: Planning and Zoning Commission meetings are held at the public safety building at 130 W. Main, Cleveland at 7:00 PM.
- How long does it take to get a building permit in Town of Cleveland, UT?
- Typical processing time is 24 hours to several weeks depending on complexity.
- What work is exempt from building permits in Town of Cleveland, UT?
- The following work is generally exempt: Detached accessory structures with floor area of 200 sq ft or less; Fences not over 7 feet high; Oil derricks; Retaining walls not over 4 feet in height; Water tanks supported directly on grade, not exceeding 5,000 gallons; Sidewalks and driveways not more than 30 inches above adjacent grade; Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work; Prefabricated swimming pools less than 24 inches deep, not greater than 5,000 gallons, installed entirely above ground; Swings and playground equipment accessory to detached one- and two-family dwellings; Window awnings supported by exterior wall; Agricultural shade cloth structures. Note: Same as county. Exemption from permit does not authorize violation of adopted codes.
- How do I schedule a building inspection in Town of Cleveland, UT?
- Inspections can be scheduled via: (435) 381-5374. 24 to 48 hours advance notice required.
Need help with your project?
Navigating permits in Town of Cleveland can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Emery County
View all Emery County jurisdictions →