County Building Permits

Upshur County, TX - 2026 Building Permit Guide

How to apply for a building permit in unincorporated Upshur County, Texas. Permit authority, application steps, fees, and inspection requirements.

Texas Updated March 2026

Permit Authority

Unincorporated Upshur County only. Reviewed county sources show narrow county controls for roads, utilities, floodplain, subdivision, and septic-OSSF matters. A city-style general countywide building permit program for ordinary building construction in unincorporated areas was not found.

Department
Upshur County Road and Bridge; Northeast Texas Municipal Water District (OSSF-septic permitting)
Address
2255 Highway 271 N, Gilmer, TX 75644
Phone
(903) 843-7623

Application Process

  1. Confirm first whether the property is truly outside city limits and ETJ-related municipal controls. If inside a city or its permitting reach, county rules alone are not enough.
  2. For county road frontage work, use Upshur County Road and Bridge. The county page posts utility regulations, utility permits, overweight-load permits, floodplain ordinance materials, subdivision plat specifications, and subdivision road specifications.
  3. For culverts, the county posts a specific process: call (903) 843-7623 to schedule culvert size evaluation, complete the permit, return it to the department, and then schedule delivery and installation.
  4. For subdivision work, submit a complete plat package. The subdivision specifications say final action must be taken within 60 days after a completed plat application is received, subject to statutory extensions and incompleteness notices.
  5. For OSSF-septic work in unincorporated areas not served by city sewer, obtain OSSF approval from the county's authorized septic permitting authority, which public sources identify through Northeast Texas Municipal Water District materials serving Upshur County.
  6. For floodplain development, confirm whether the site lies in regulated floodplain and whether the county floodplain ordinance requires prior approval.

Typical processing time: Plat applications are subject to county action within 60 days after a completed application is received. No general county building permit timeline was found because no general county building permit program was verified.

Source: Upshur County Road and Bridge; Northeast Texas Municipal Water District (OSSF-septic permitting)

General Requirements

No general countywide building permit requirement for ordinary construction in unincorporated Upshur County was clearly documented in reviewed official county sources. Verified county-level controls include county road utility permits, culvert-driveway related road permits, overweight-load permits, subdivision plat approval and subdivision-road standards, floodplain controls, and OSSF-septic permitting.

Required Documents

  • Depends on the narrower county program. Verified examples include subdivision plats and required supporting documents, utility permits, culvert permits, route-date details for overweight loads, and OSSF site-soil evaluation materials.
Building code
No official public source reviewed showed that Upshur County has adopted a general countywide building code and permit program for all unincorporated construction. Do not assume city-style county building code enforcement here.
Owner-builder
The OSSF FAQ states a homeowner may install an OSSF for a single-family residence only, but if any hired person performs work other than a licensed electrician, that person must hold the appropriate OSSF installer license. Multi-family, speculative, and commercial OSSF systems must be installed by a licensed installer.
Contractor requirements
County road-right-of-way and subdivision documents do not establish a general contractor licensing program for all building work. OSSF work is subject to state-TCEQ licensing rules, and regulated state trade licensing still applies where relevant.

Fees

Payment note
County pages reviewed did not identify an online permit-payment portal for these narrow county programs.

Work That Does NOT Require a Permit

  • For OSSF only: the '10 acre rule' can eliminate the need for an OSSF permit for a single-family home on a single tract of at least 10 acres if all listed statutory conditions are met, including site-soil evaluation, one dwelling only, and 100-foot setbacks from property lines.

Important: No public county exempt-work list for a general building permit was found because no general county building permit program was verified.

Inspections

How to Schedule

  • Road and Bridge at (903) 843-7623 (phone)
Inspection hours
6:00 a.m. to 12:00 p.m. and 12:30 p.m. to 4:30 p.m., Monday through Thursday

Typical inspection sequence: County sources reviewed support a narrower sequence of road-right-of-way review, culvert evaluation, permit submission, and installation coordination, plus subdivision review and OSSF inspection where applicable. No general building inspection sequence was verified because no countywide building permit program was found.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Upshur County Road and Bridge; Northeast Texas Municipal Water District (OSSF-septic permitting) before applying.

Frequently Asked Questions

Upshur County Building Permit FAQ

Do I need a building permit in unincorporated Upshur County, TX?
No general countywide building permit requirement for ordinary construction in unincorporated Upshur County was clearly documented in reviewed official county sources. Verified county-level controls include county road utility permits, culvert-driveway related road permits, overweight-load permits, subdivision plat approval and subdivision-road standards, floodplain controls, and OSSF-septic permitting.
How do I apply for a building permit in unincorporated Upshur County, TX?
1. Confirm first whether the property is truly outside city limits and ETJ-related municipal controls. If inside a city or its permitting reach, county rules alone are not enough. 2. For county road frontage work, use Upshur County Road and Bridge. The county page posts utility regulations, utility permits, overweight-load permits, floodplain ordinance materials, subdivision plat specifications, and subdivision road specifications. 3. For culverts, the county posts a specific process: call (903) 843-7623 to schedule culvert size evaluation, complete the permit, return it to the department, and then schedule delivery and installation. 4. For subdivision work, submit a complete plat package. The subdivision specifications say final action must be taken within 60 days after a completed plat application is received, subject to statutory extensions and incompleteness notices. 5. For OSSF-septic work in unincorporated areas not served by city sewer, obtain OSSF approval from the county's authorized septic permitting authority, which public sources identify through Northeast Texas Municipal Water District materials serving Upshur County. 6. For floodplain development, confirm whether the site lies in regulated floodplain and whether the county floodplain ordinance requires prior approval.
How long does it take to get a building permit in unincorporated Upshur County, TX?
Typical processing time is Plat applications are subject to county action within 60 days after a completed application is received. No general county building permit timeline was found because no general county building permit program was verified..
What work is exempt from building permits in unincorporated Upshur County, TX?
The following work is generally exempt: For OSSF only: the '10 acre rule' can eliminate the need for an OSSF permit for a single-family home on a single tract of at least 10 acres if all listed statutory conditions are met, including site-soil evaluation, one dwelling only, and 100-foot setbacks from property lines.. Note: No public county exempt-work list for a general building permit was found because no general county building permit program was verified.
How do I schedule a building inspection in unincorporated Upshur County, TX?
Inspections can be scheduled via: Road and Bridge at (903) 843-7623.

Need help with your project?

Navigating permits in Unincorporated Upshur County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.