City Building Permits

Goliad, TX - 2026 Building Permit Guide

How to apply for a building permit in Goliad, Texas. Permit authority, application steps, fees, and inspection requirements.

Texas Goliad County Updated March 2026

Permit Authority

All properties within the incorporated City of Goliad city limits.

Department
Building Inspection
Address
City Hall, 152 W End Street, Goliad, TX 77963
Phone
361-645-3454

Application Process

  1. Obtain the residential or commercial permit packet from the Building Inspection page.
  2. Complete the permit application and assemble the required plans, engineering documents, and supporting materials.
  3. Submit the permit documents and fees to City Hall. Incomplete applications are placed on hold until missing information is provided.
  4. The city or its contracted reviewer, Bureau Veritas, checks the packet for completeness, zoning and setback compliance, code issues, and energy-code compliance.
  5. If revisions are needed, the applicant is contacted and must resubmit corrected documents before review can continue.
  6. After approval, the permit packet is returned to the city and city staff issue the permit after fees are collected.
  7. Work may begin only after permit issuance. Starting work before permit approval doubles the fee.

Typical processing time: No public turnaround time was posted for permit issuance. For inspections, requests must be received by 5:00 PM for next-day inspection.

Source: Building Inspection

General Requirements

A permit is required for any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change occupancy of a building or structure, or install, alter, repair, remove, convert, or replace regulated electrical, gas, mechanical, or plumbing systems, as well as structural work, plumbing, electrical, mechanical, fire sprinklers, irrigation, pools and spas, new fences, signs, temporary structures, accessory buildings 120 square feet or larger, decks, gas tanks, curb cuts, street cuts, fire hydrants, floodplain construction or modifications, flatwork, patio covers, roofing, siding, soffit, fascia, window replacement, solar panels, moving, blasting, burning, tents, food and beverage uses, and home occupations.

Required Documents

  • Permit application
  • Two plot plans with legal description and lot dimensions
  • Two energy reports (residential)
  • Two stamped engineered foundation letters
  • Two stamped engineered foundation plans
  • Two sets of house plans
  • Site plans
  • Easements, setbacks, and driveway information
  • Foundation, electrical, and plumbing plans
  • Energy compliance report
Permit validity
No public city code section or permit packet page reviewed gave a general permit-expiration period. The fee schedule does include a permit-renewal charge for expired permits with no changes.
Building code
City sources conflict: the FAQ page states the City Council adopted the 2006 International Building Codes, while the commercial permit packet states adoption of the 2012 International Building Code, 2012 International Residential Code, 2012 International Fire Code, 2012 International Plumbing Code, 2012 International Mechanical Code, 2012 International Energy Conservation Code, 2012 International Fuel and Gas Code, and 2012 National Electrical Code. Applicants should confirm the currently enforced code editions with City Hall before submittal.
Owner-builder
The city allows an owner or authorized agent to apply. The Building Inspection page warns owners not to pull permits for contractors because the permit record will then show the owner as the person who performed the work.
Contractor requirements
The city advises using licensed trade contractors, specifically listing electricians, plumbers, air conditioning contractors, and irrigation contractors as licensed trades. Commercial permit packets state all contractors performing work within the city's jurisdiction must be registered with the city and provide proof of commercial general liability insurance for property-damage or bodily-injury claims.

Fees

Minimum permit fee
$20
Plan check fee
15% administrative cost on contracted permits based on valuation, with the contract engineer providing the cost estimate.
Permit fee formula
Building, mechanical, electrical, plumbing, fuel gas, fence, and accessory-building permits are valuation-based. New residential construction is square-footage-based. Fire suppression permit is a flat $450. Travelway permit is a flat $30.
Reinspection fee
Work started before permit issuance is charged at double the total fee. Permit renewal for an expired permit with no changes is half the price of the original permit.
Penalty (no permit)
Double the total fee for work started before permit issuance.
Payment note
Forms of payment for building permits are cash, check, or money order only. The fee schedule lists a municipal debit or credit card processing fee of 2.5% of the transaction amount or $2.25 (whichever is greater), but this may not apply to building permits. Confirm accepted payment methods with City Hall before payment.

Fees change. Verify current amounts at the official fee schedule (effective May 1, 2025).

Work That Does NOT Require a Permit

  • Water tanks supported directly on grade if capacity does not exceed 5,000 gallons and the height-to-diameter or height-to-width ratio does not exceed 2 to 1.
  • Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work.
  • Temporary motion-picture, television, and theater stage sets and scenery.
  • Shade cloth structures for nursery or agricultural purposes, excluding service systems.
  • Swings and other temporary playground equipment accessory to one- and two-family dwellings.
  • One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses on the same lot as a one- or two-family dwelling when the floor area is 120 square feet or less and the structure can be moved if necessary (except in flood hazard areas).
  • Replacement fences on one- or two-family property when the replacement is in the same location, same height, and same materials as the fence being replaced and otherwise complies with the city development code (except in flood hazard areas).
  • Electrical normal maintenance such as replacement of lamps, sockets, fuses, drop cords, snap switches, and similar minor repairs.
  • Connection of portable electrical equipment to suitable existing permanently installed receptacles.
  • Replacement of a motor of the same horsepower and rating with properly installed supply by a licensed electrician.
  • Portable heating appliances and replacement of minor gas-equipment parts that do not alter approval or make the equipment unsafe.
  • Portable ventilation equipment, portable cooling units, and portable evaporative coolers.
  • Self-contained refrigeration systems containing 10 pounds or less of refrigerant and actuated by motors of 1 horsepower or less.
  • Plumbing leak stopping, stoppage clearing, and fixture removal and reinstallation when the work does not require replacement or rearrangement of valves, pipes, or fixtures.

Inspections

How to Schedule

  • Fax inspection request to Bureau Veritas (fax)
  • Call Bureau Veritas at 817-335-8111 or toll-free 877-837-8775 (phone)
Scheduling deadline
Requests must be received by 5:00 PM for next-day inspection.
Inspection hours
No public hourly inspection window was posted.

Typical inspection sequence: Typical inspections include plumbing rough, water service, yard sewer, form board survey, gas wrap, foundation, electric rough, mechanical rough, gas rough piping test, plumbing top-out, framing, windstorm, energy insulation, construction electric, gas final, electrical final, mechanical final, plumbing final, energy final, building final, customer service inspection form, T-pole, and flatwork.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Inspection before applying.

Frequently Asked Questions

Goliad Building Permit FAQ

Do I need a building permit in Goliad, TX?
A permit is required for any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change occupancy of a building or structure, or install, alter, repair, remove, convert, or replace regulated electrical, gas, mechanical, or plumbing systems, as well as structural work, plumbing, electrical, mechanical, fire sprinklers, irrigation, pools and spas, new fences, signs, temporary structures, accessory buildings 120 square feet or larger, decks, gas tanks, curb cuts, street cuts, fire hydrants, floodplain construction or modifications, flatwork, patio covers, roofing, siding, soffit, fascia, window replacement, solar panels, moving, blasting, burning, tents, food and beverage uses, and home occupations.
How much does a building permit cost in Goliad, TX?
The minimum permit fee is $20. Fees are calculated as: Building, mechanical, electrical, plumbing, fuel gas, fence, and accessory-building permits are valuation-based. New residential construction is square-footage-based. Fire suppression permit is a flat $450. Travelway permit is a flat $30.. Plan check fee: 15% administrative cost on contracted permits based on valuation, with the contract engineer providing the cost estimate..
How do I apply for a building permit in Goliad, TX?
1. Obtain the residential or commercial permit packet from the Building Inspection page. 2. Complete the permit application and assemble the required plans, engineering documents, and supporting materials. 3. Submit the permit documents and fees to City Hall. Incomplete applications are placed on hold until missing information is provided. 4. The city or its contracted reviewer, Bureau Veritas, checks the packet for completeness, zoning and setback compliance, code issues, and energy-code compliance. 5. If revisions are needed, the applicant is contacted and must resubmit corrected documents before review can continue. 6. After approval, the permit packet is returned to the city and city staff issue the permit after fees are collected. 7. Work may begin only after permit issuance. Starting work before permit approval doubles the fee.
How long does it take to get a building permit in Goliad, TX?
Typical processing time is No public turnaround time was posted for permit issuance. For inspections, requests must be received by 5:00 PM for next-day inspection..
What work is exempt from building permits in Goliad, TX?
The following work is generally exempt: Water tanks supported directly on grade if capacity does not exceed 5,000 gallons and the height-to-diameter or height-to-width ratio does not exceed 2 to 1.; Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work.; Temporary motion-picture, television, and theater stage sets and scenery.; Shade cloth structures for nursery or agricultural purposes, excluding service systems.; Swings and other temporary playground equipment accessory to one- and two-family dwellings.; One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses on the same lot as a one- or two-family dwelling when the floor area is 120 square feet or less and the structure can be moved if necessary (except in flood hazard areas).; Replacement fences on one- or two-family property when the replacement is in the same location, same height, and same materials as the fence being replaced and otherwise complies with the city development code (except in flood hazard areas).; Electrical normal maintenance such as replacement of lamps, sockets, fuses, drop cords, snap switches, and similar minor repairs.; Connection of portable electrical equipment to suitable existing permanently installed receptacles.; Replacement of a motor of the same horsepower and rating with properly installed supply by a licensed electrician.; Portable heating appliances and replacement of minor gas-equipment parts that do not alter approval or make the equipment unsafe.; Portable ventilation equipment, portable cooling units, and portable evaporative coolers.; Self-contained refrigeration systems containing 10 pounds or less of refrigerant and actuated by motors of 1 horsepower or less.; Plumbing leak stopping, stoppage clearing, and fixture removal and reinstallation when the work does not require replacement or rearrangement of valves, pipes, or fixtures..
How do I schedule a building inspection in Goliad, TX?
Inspections can be scheduled via: Fax inspection request to Bureau Veritas, Call Bureau Veritas at 817-335-8111 or toll-free 877-837-8775. Requests must be received by 5:00 PM for next-day inspection..

Need help with your project?

Navigating permits in Goliad can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.