County Building Permits
Camp County, TX - 2026 Building Permit Guide
How to apply for a building permit in unincorporated Camp County, Texas. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Unincorporated Camp County only. County controls are narrower and limited to subdivision plat approval, county road right-of-way utility installation, OSSF administration, and flood-related restrictions rather than a general building permit program.
- Department
- Camp County Commissioners Court / County Judge
- Address
- Camp County Judge / Commissioners Court, 126 Church Street, Room 303, Pittsburg, TX 75686
- Phone
- 903-856-3848
- aj.mason@co.camp.tx.us
- Website
- https://www.co.camp.tx.us/
Application Process
- Determine whether the project is in unincorporated Camp County and whether it triggers one of the county's narrower controls rather than a general building permit.
- For subdivision activity, submit the required plat package to the County Judge office for Commissioners Court review. The county's subdivision packet requires multiple plat copies, a current tax certificate, utility letters, and the filing fee.
- For county road right-of-way utility installation, submit the county Notice of Proposed Installation form with drawings to the Commissioners Court care of the County Judge. The form states construction must follow county specifications and be completed within 90 days of approval.
- For OSSF or septic work, verify whether Camp County is acting as the local authorized agent on the parcel and obtain the current local process directly from the county.
- For flood-prone parcels, confirm any floodplain or drainage restrictions directly with the county before building. The county hazard mitigation plan references county regulations restricting building in flood-prone areas.
Typical processing time: No general building permit timeline published. Utility permit valid until the utility line is removed from the right-of-way; work must be completed within 90 days of approval. Subdivision platting occurs through Commissioners Court scheduling.
General Requirements
No verified public source showed a countywide general building permit requirement for ordinary building construction in unincorporated Camp County. Verified county controls instead include subdivision plat approval, county road right-of-way utility installation approval, and OSSF administration where the county is the authorized agent. Flood-related restrictions may also apply on affected parcels.
Required Documents
- For subdivision plat review: multiple plat copies, tax certificate, utility letters, road name request if needed, and filing materials for the County Clerk
- For utility line work in county right-of-way: project details plus attached drawings
- For OSSF work: contact county directly for documentation requirements
- Permit validity
- Utility permit valid until the utility line is removed from the right-of-way; work must be completed within 90 days of approval. No general building permit expiration rule found because no general building permit program was identified.
- Contractor requirements
- No countywide general contractor licensing program was identified. State licensing still applies to regulated trades such as electrical and plumbing work.
Fees
- Minimum permit fee
- $48 (subdivision filing fee to County Clerk)
- Permit fee formula
- Flat subdivision filing fee. No public fee formula was found for a general county building permit because no such public program was identified.
- Payment note
- The subdivision packet states the filing fee must be paid by cashier's check, money order, or cash. Personal checks are not accepted. No online payment portal was found.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
Contact the Camp County Commissioners Court / County Judge to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Contact Commissioners Court (phone)
Typical inspection sequence: No public countywide building inspection process was found. Utility right-of-way work must be coordinated with the precinct commissioner. OSSF inspection procedures were not publicly posted.
Additional Resources
- Verify contractor license: Texas TDLR License Lookup
- Camp County Commissioners Court
- County Document Search
- TCEQ OSSF Program Overview
- License lookup guide: Texas Contractor License Requirements
- Contract template: Texas Homeowner-Contractor Agreement
- Texas hub: Texas Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Camp County Commissioners Court / County Judge before applying.
Frequently Asked Questions
Camp County Building Permit FAQ
- Do I need a building permit in unincorporated Camp County, TX?
- No verified public source showed a countywide general building permit requirement for ordinary building construction in unincorporated Camp County. Verified county controls instead include subdivision plat approval, county road right-of-way utility installation approval, and OSSF administration where the county is the authorized agent. Flood-related restrictions may also apply on affected parcels.
- How much does a building permit cost in unincorporated Camp County, TX?
- The minimum permit fee is $48 (subdivision filing fee to County Clerk). Fees are calculated as: Flat subdivision filing fee. No public fee formula was found for a general county building permit because no such public program was identified..
- How do I apply for a building permit in unincorporated Camp County, TX?
- 1. Determine whether the project is in unincorporated Camp County and whether it triggers one of the county's narrower controls rather than a general building permit. 2. For subdivision activity, submit the required plat package to the County Judge office for Commissioners Court review. The county's subdivision packet requires multiple plat copies, a current tax certificate, utility letters, and the filing fee. 3. For county road right-of-way utility installation, submit the county Notice of Proposed Installation form with drawings to the Commissioners Court care of the County Judge. The form states construction must follow county specifications and be completed within 90 days of approval. 4. For OSSF or septic work, verify whether Camp County is acting as the local authorized agent on the parcel and obtain the current local process directly from the county. 5. For flood-prone parcels, confirm any floodplain or drainage restrictions directly with the county before building. The county hazard mitigation plan references county regulations restricting building in flood-prone areas.
- How long does it take to get a building permit in unincorporated Camp County, TX?
- Typical processing time is No general building permit timeline published. Utility permit valid until the utility line is removed from the right-of-way; work must be completed within 90 days of approval. Subdivision platting occurs through Commissioners Court scheduling..
- How do I schedule a building inspection in unincorporated Camp County, TX?
- Inspections can be scheduled via: Contact Commissioners Court.
Need help with your project?
Navigating permits in Unincorporated Camp County can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector works