Permit Authority

Lewis County's zoning page states the county does not require a building permit for any type or size of structure outside Hohenwald city limits and does not have a building and codes department. The county page directs questions about building and codes to the City of Hohenwald.

Department
No county building permit department
Address
110 North Park Street, Room 108, Hohenwald, TN 38462 for the courthouse, but not a county permit office
Phone
931-796-3378 for the county government main line

Online Permit Portal

Platform: None • Account required: No • Submission: In-person only

Application Process

  1. Confirm the property is outside Hohenwald city limits.
  2. Recognize that Lewis County does not require a building permit for any type or size of structure outside the city limits.
  3. Follow Tennessee state law and any utility or septic requirements that still apply.
  4. Contact the relevant state or utility agency for septic, electric, or other regulated services as needed.

Typical processing time: Not applicable because the county does not issue building permits.

Source: No county building permit department

General Requirements

Lewis County says no building permit is required outside the City of Hohenwald for any type of structure or any size of structure, residential or commercial.

Required Documents

  • None for a county building permit because the county does not issue one. Separate state or utility requirements may still apply.
Permit validity
Not applicable at the county level because no county building permit is issued.
Building code
Lewis County says it requires only what is outlined in Tennessee Code outside the city limits. The county page does not identify a county-adopted local building code set.
Owner-builder
Thin public data. The county page does not publish owner-builder rules because it does not run a building permit program.
Contractor requirements
No county building permit licensing requirement was published because the county does not issue permits.

Fees

Minimum permit fee
None
Plan check fee
None
Permit fee formula
None, because no county building permit fee is charged
Reinspection fee
None at the county building-permit level
Payment note
Lewis County says there are no fees associated with building new structures outside the city limits of Hohenwald.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Contact the No county building permit department to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • None at the county building-permit level (phone)
Inspection hours
Not applicable
Time windows
Not applicable

Typical inspection sequence: Not applicable at the county building-permit level

Not applicable at the county building-permit level

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the No county building permit department before applying.

Frequently Asked Questions

Lewis County Building Permit FAQ

Do I need a building permit in unincorporated Lewis County, TN?
Lewis County says no building permit is required outside the City of Hohenwald for any type of structure or any size of structure, residential or commercial.
How much does a building permit cost in unincorporated Lewis County, TN?
The minimum permit fee is None. Fees are calculated as: None, because no county building permit fee is charged. Plan check fee: None.
How do I apply for a building permit in unincorporated Lewis County, TN?
1. Confirm the property is outside Hohenwald city limits. 2. Recognize that Lewis County does not require a building permit for any type or size of structure outside the city limits. 3. Follow Tennessee state law and any utility or septic requirements that still apply. 4. Contact the relevant state or utility agency for septic, electric, or other regulated services as needed.
How long does it take to get a building permit in unincorporated Lewis County, TN?
Typical processing time is Not applicable because the county does not issue building permits..
What work is exempt from building permits in unincorporated Lewis County, TN?
The following work is generally exempt: Lewis County states no building permit is required for any type of structure or any sized structure outside Hohenwald city limits; Emergency backup power generators are specifically stated to require no county permit.
How do I schedule a building inspection in unincorporated Lewis County, TN?
Inspections can be scheduled via: None at the county building-permit level.

Need help with your project?

Navigating permits in Unincorporated Lewis County can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Lewis County permit guides