City Building Permits
Waynesboro Borough, PA - 2026 Building Permit Guide
How to apply for a building permit in Waynesboro Borough, Pennsylvania. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
The borough states most projects require two permits, a zoning or land use permit from the borough and a building permit from PMCA or CCIS. The borough page still cites older Chambersburg addresses for those agencies, so applicants should verify current agency office addresses before filing.
- Department
- Borough of Waynesboro Zoning-Code Enforcement Office
- Address
- 55 East Main Street, Waynesboro, PA 17268
- Phone
- 717-762-2101 ext. 230 or ext. 248; PMCA 717-496-4996; CCIS 717-264-9191
Online Permit Portal
Platform: Borough of Waynesboro website • Account required: No • Submission: In-person only
Application Process
- Start with the borough Zoning-Code Enforcement Office and determine whether the project needs a zoning or land use permit or exemption.
- Submit the borough zoning or land use application with construction drawings and a sketch of the property showing dimensions and proposed improvements.
- Obtain the borough land use permit or exemption first.
- Submit the building permit application to PMCA or CCIS if the work is UCC regulated.
- Complete inspections and obtain final approval before occupancy or use.
Typical processing time: No borough specific turnaround was posted
Source: Borough of Waynesboro Zoning-Code Enforcement Office
General Requirements
The borough states most projects require two permits, a zoning or land use permit and a building permit; construction drawings and a property sketch must be submitted for plan review before a zoning or land use permit is issued
- Permit validity
- No borough specific expiration rule was clearly posted; UCC permits follow Pennsylvania default timing
- Building code
- Pennsylvania UCC; Waynesboro is listed by the Commonwealth as an opt in municipality, and the borough page says building permits are issued by PMCA or CCIS
- Owner-builder
- Applications may be made by the owner, an agent of the owner, or a registered design professional employed in connection with the proposed work
- Contractor requirements
- Pennsylvania HICPA registration applies where required
Work That Does NOT Require a Permit
Contact the Borough of Waynesboro Zoning-Code Enforcement Office to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Inspection hours
- Borough office and inspection hours Monday through Friday 8:00 AM to 4:00 PM, with appointments from 7:00 AM to 8:00 AM or 4:00 PM to 5:00 PM; PMCA states requests submitted before 3:00 PM are generally targeted for the next business day
Typical inspection sequence: Borough zoning or land use approval first, then UCC inspections through PMCA or CCIS
Additional Resources
- Building code: Pennsylvania UCC; Waynesboro is listed by the Commonwealth as an opt in municipality, and the borough page says building permits are issued by PMCA or CCIS
- License lookup guide: Pennsylvania Contractor License Requirements
- Contract template: Pennsylvania Homeowner-Contractor Agreement
- Pennsylvania hub: Pennsylvania Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Borough of Waynesboro Zoning-Code Enforcement Office before applying.
Frequently Asked Questions
Waynesboro Borough Building Permit FAQ
- Do I need a building permit in Waynesboro Borough, PA?
- The borough states most projects require two permits, a zoning or land use permit and a building permit; construction drawings and a property sketch must be submitted for plan review before a zoning or land use permit is issued
- How do I apply for a building permit in Waynesboro Borough, PA?
- 1. Start with the borough Zoning-Code Enforcement Office and determine whether the project needs a zoning or land use permit or exemption. 2. Submit the borough zoning or land use application with construction drawings and a sketch of the property showing dimensions and proposed improvements. 3. Obtain the borough land use permit or exemption first. 4. Submit the building permit application to PMCA or CCIS if the work is UCC regulated. 5. Complete inspections and obtain final approval before occupancy or use.
- How long does it take to get a building permit in Waynesboro Borough, PA?
- Typical processing time is No borough specific turnaround was posted.
Need help with your project?
Navigating permits in Waynesboro Borough can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector works