City Building Permits
West Fargo, ND - 2026 Building Permit Guide
How to apply for a building permit in West Fargo, North Dakota. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Administers building and mechanical permits within West Fargo city limits. Electrical permits handled by the ND State Electrical Board (701-400-1549); plumbing by the ND State Plumbing Board (701-799-1555).
- Department
- Building and Inspections Division, City of West Fargo
- Address
- 2515 6th Street E, West Fargo, ND 58078
- Phone
- 701-515-5380
Online Permit Portal
Platform: iWorQ • Account required: Yes • Submission: In-person only
Additional resources:
Application Process
- Review project guidelines (deck, garage, addition, etc.) available on city website
- Complete permit application (downloadable from city website or available at City Hall)
- Submit application online via iWorQ portal or in person at City Hall (2515 6th Street E)
- Plan review by Building and Inspections Division
- Pay permit fee
- Permit issued; post at job site
- Contact Building Department to schedule required inspections (call 701-515-5380)
- Work proceeds between inspections; do not cover work before inspection sign-off
- Final inspection and project closeout
Typical processing time: Mechanical, reroofing, residing permits may issue same-day if time allows. Most building permits: up to 2 business days for complete applications. Incomplete applications take longer. Allow extra time during summer construction season.
Source: Building and Inspections Division, City of West Fargo
General Requirements
Additions, decks, porches, finishing basements, replacing doors and windows of different sizes, interior renovations with structural modifications, demolition, accessory structures, swimming pools, residing, all HVAC systems, all gas appliances and equipment, wood stoves, use changes. Separate plumbing and electrical permits required for those trades.
Required Documents
- Permit application form
- Project plans and drawings
- Stormwater management permit for new construction
- Asbestos information for applicable projects
- Gas meter clearance documentation as required
- Permit validity
- Not specified on public pages; contact department
- Building code
- ICC (International Code Council) standards adopted. Per state mandate, adopts IBC, IRC, IMC, IFGC. State update to 2024 editions effective January 1, 2026.
- Owner-builder
- Not specified; contact department
- Contractor requirements
- State contractor license required for jobs over $4,000 (ND Secretary of State). Electrical: ND State Electrical Board. Plumbing: ND State Plumbing Board.
Fees
- Plan check fee
- Not published separately; contact department
- Permit fee formula
- Valuation-based for building permits; mechanical permits based on type, size, and number of appliances installed. Contact department at 701-515-5380 for specific schedule.
- Reinspection fee
- Not published on city website; contact department
- Payment note
- In person at City Hall or online through iWorQ portal; fire permit fees (separate) are $70-$140/year for operational permits and $100 + percentage of project cost for construction fire permits
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Painting (interior and exterior)
- Wallpaper installation
- Cabinet replacement and similar finish work
- Accessory buildings with floor area of 120 sq ft or less
- Concrete sidewalks and patios entirely on the property
- Insulation of an existing building where no structural changes are made
Inspections
How to Schedule
- 701-515-5380 (7:30 a.m.-4:30 p.m., Mon-Fri) (phone)
- Inspection hours
- Monday-Friday 7:30 a.m.-4:30 p.m.
Typical inspection sequence: Footing, framing, insulation, rough-in mechanical/plumbing/electrical, final inspection. Framing and final inspection checklists available on city website.
Additional Resources
- Building code: ICC (International Code Council) standards adopted. Per state mandate, adopts IBC, IRC, IMC, IFGC. State update to 2024 editions effective January 1, 2026.
- Verify contractor license: ND Secretary of State Contractor License Lookup
- Zoning information: View zoning info
- Building Inspection Activity Reports
- Contact Planning and Zoning
- License lookup guide: North Dakota Contractor License Requirements
- Contract template: North Dakota Homeowner-Contractor Agreement
- North Dakota hub: North Dakota Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Inspections Division, City of West Fargo before applying.
Frequently Asked Questions
West Fargo Building Permit FAQ
- Do I need a building permit in West Fargo, ND?
- Additions, decks, porches, finishing basements, replacing doors and windows of different sizes, interior renovations with structural modifications, demolition, accessory structures, swimming pools, residing, all HVAC systems, all gas appliances and equipment, wood stoves, use changes. Separate plumbing and electrical permits required for those trades.
- How much does a building permit cost in West Fargo, ND?
- Fees are calculated as: Valuation-based for building permits; mechanical permits based on type, size, and number of appliances installed. Contact department at 701-515-5380 for specific schedule.. Plan check fee: Not published separately; contact department.
- How do I apply for a building permit in West Fargo, ND?
- 1. Review project guidelines (deck, garage, addition, etc.) available on city website 2. Complete permit application (downloadable from city website or available at City Hall) 3. Submit application online via iWorQ portal or in person at City Hall (2515 6th Street E) 4. Plan review by Building and Inspections Division 5. Pay permit fee 6. Permit issued; post at job site 7. Contact Building Department to schedule required inspections (call 701-515-5380) 8. Work proceeds between inspections; do not cover work before inspection sign-off 9. Final inspection and project closeout
- How long does it take to get a building permit in West Fargo, ND?
- Typical processing time is Mechanical, reroofing, residing permits may issue same-day if time allows. Most building permits: up to 2 business days for complete applications. Incomplete applications take longer. Allow extra time during summer construction season..
- What work is exempt from building permits in West Fargo, ND?
- The following work is generally exempt: Painting (interior and exterior); Wallpaper installation; Cabinet replacement and similar finish work; Accessory buildings with floor area of 120 sq ft or less; Concrete sidewalks and patios entirely on the property; Insulation of an existing building where no structural changes are made.
- How do I schedule a building inspection in West Fargo, ND?
- Inspections can be scheduled via: 701-515-5380 (7:30 a.m.-4:30 p.m., Mon-Fri).
Need help with your project?
Navigating permits in West Fargo can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Cass County
View all Cass County jurisdictions →