City Building Permits
Town of Centreville, MS - 2026 Building Permit Guide
How to apply for a building permit in Town of Centreville, Mississippi. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
All properties within the incorporated Town of Centreville. Centreville is the largest town in Wilkinson County and straddles the Wilkinson/Amite county line.
- Department
- Building Permits and Inspections Department
- Address
- 1 Municipal Drive, Centreville, MS 39631
- Phone
- (601) 645-5218
- Website
- https://townofcentrevillems.org/
Online Permit Portal
Platform: • Account required: No • Submission: In-person only
Additional resources:
Application Process
- Download the building permit application form from townofcentrevillems.org/building-permits-and-inspections or call (601) 645-5218 to request forms.
- Complete the building permit application form with all required information (owner, contractor, project description, valuation).
- Attach supporting documents: site plan, architectural/engineering drawings (if required by project type), proof of contractor licensing for projects above MSBOC thresholds.
- Submit completed application and documents to City Hall at 1 Municipal Drive.
- Staff reviews for compliance with local zoning and building code; coordinates with the Planning and Zoning Commission as needed.
- Permit issued upon approval.
- Schedule inspections at each required construction stage with the Building Permits and Inspections Department.
- Final inspection and Certificate of Occupancy issued before occupancy.
Typical processing time: Processing time not documented. Contact Building Permits Department for current timeline.
General Requirements
Building permits are required for new construction (residential and commercial), additions and major alterations, structural changes, electrical, plumbing, and mechanical work, change of use or occupancy, and Certificate of Occupancy required for all new structures before occupancy.
Required Documents
- Building permit application form
- Site plan
- Architectural/engineering drawings (if required by project type)
- Proof of contractor licensing (for projects above MSBOC thresholds)
- Property ownership documentation
- Building code
- Centreville is authorized under MS Code § 17-2-4 to adopt any of the last three editions of IBC or IRC. The state standard is 2021 IBC/2021 IRC (effective 2024). The specific edition adopted by Centreville is not published online. Contact the Building Permits and Inspections Department at (601) 645-5218 for the current adopted code edition.
- Contractor requirements
- Contractors must hold appropriate Mississippi Board of Contractors (MSBOC) licensing if project exceeds thresholds (residential builder license for $50,000+, residential remodeler for $10,000+, commercial general contractor for $50,000+).
Fees
- Payment note
- Specific fee schedule not published online. Contact the Building Permits and Inspections Department at (601) 645-5218 for the current fee schedule. The town's FAQ indicates that staff can provide fee information by phone.
Work That Does NOT Require a Permit
- Agricultural exemptions available for farm buildings on eligible agricultural land; confirm with Building Permits Department.
- Verify flood zone status and NFIP requirements via FEMA MSC before proceeding.
Important: Centreville is bisected by Homochitto River and its tributaries. Properties in designated Special Flood Hazard Areas must comply with National Flood Insurance Program (NFIP) elevation and construction requirements and may require elevation certificates.
Inspections
How to Schedule
- (601) 645-5218 (phone)
- Inspection hours
- Monday – Friday, 8:00 a.m. – 4:00 p.m.
Typical inspection sequence: The Building Permits and Inspections Department performs all construction inspections. Standard inspection stages (verify specific schedule with the department): Foundation/footing inspection (before concrete pour), Framing inspection (after framing, before enclosure), Rough electrical, plumbing, and mechanical inspection (before wall covering), Final inspection (Certificate of Occupancy issued upon passing). The department also coordinates inspections for Fire Prevention permits.
Additional Resources
- Building code: Centreville is authorized under MS Code § 17-2-4 to adopt any of the last three editions of IBC or IRC. The state standard is 2021 IBC/2021 IRC (effective 2024). The specific edition adopted by Centreville is not published online. Contact the Building Permits and Inspections Department at (601) 645-5218 for the current adopted code edition.
- Verify contractor license: Mississippi Board of Contractors License Lookup
- Town of Centreville Website
- Building Permits and Inspections
- FEMA Flood Maps
- MS Department of Archives & History (Historic Preservation)
- License lookup guide: Mississippi Contractor License Requirements
- Contract template: Mississippi Homeowner-Contractor Agreement
- Mississippi hub: Mississippi Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Permits and Inspections Department before applying.
Frequently Asked Questions
Town of Centreville Building Permit FAQ
- Do I need a building permit in Town of Centreville, MS?
- Building permits are required for new construction (residential and commercial), additions and major alterations, structural changes, electrical, plumbing, and mechanical work, change of use or occupancy, and Certificate of Occupancy required for all new structures before occupancy.
- How do I apply for a building permit in Town of Centreville, MS?
- 1. Download the building permit application form from townofcentrevillems.org/building-permits-and-inspections or call (601) 645-5218 to request forms. 2. Complete the building permit application form with all required information (owner, contractor, project description, valuation). 3. Attach supporting documents: site plan, architectural/engineering drawings (if required by project type), proof of contractor licensing for projects above MSBOC thresholds. 4. Submit completed application and documents to City Hall at 1 Municipal Drive. 5. Staff reviews for compliance with local zoning and building code; coordinates with the Planning and Zoning Commission as needed. 6. Permit issued upon approval. 7. Schedule inspections at each required construction stage with the Building Permits and Inspections Department. 8. Final inspection and Certificate of Occupancy issued before occupancy.
- How long does it take to get a building permit in Town of Centreville, MS?
- Typical processing time is Processing time not documented. Contact Building Permits Department for current timeline..
- What work is exempt from building permits in Town of Centreville, MS?
- The following work is generally exempt: Agricultural exemptions available for farm buildings on eligible agricultural land; confirm with Building Permits Department.; Verify flood zone status and NFIP requirements via FEMA MSC before proceeding.. Note: Centreville is bisected by Homochitto River and its tributaries. Properties in designated Special Flood Hazard Areas must comply with National Flood Insurance Program (NFIP) elevation and construction requirements and may require elevation certificates.
- How do I schedule a building inspection in Town of Centreville, MS?
- Inspections can be scheduled via: (601) 645-5218.
Need help with your project?
Navigating permits in Town of Centreville can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.