City Building Permits

Town of Mathiston, MS - 2026 Building Permit Guide

How to apply for a building permit in Town of Mathiston, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Mississippi Webster County Updated March 2026

Permit Authority

Incorporated limits of the Town of Mathiston in Webster County. Mathiston straddles the border between Webster and Choctaw Counties; confirm which county's jurisdiction applies to your specific parcel before applying. Building permits within Mathiston's town limits are issued by Town Hall, not by Webster County or Choctaw County.

Department
Town of Mathiston — Town Hall
Address
41 Mathis Drive, Mathiston, MS 39752
Phone
(662) 263-4898

Online Permit Portal

Platform: AccessGov • Account required: No • Submission: Online only

Additional resources:

Application Process

  1. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm permit requirements and applicable zoning for your property.
  2. Confirm whether the property is in Webster County or Choctaw County portion of Mathiston.
  3. Submit building permit application via online portal (ms.accessgov.com/mathiston/Forms/Page/mathiston/building-permit/), in person at 41 Mathis Drive, or by mail at P.O. Box 178, Mathiston, MS 39752.
  4. Prepare required supporting documentation: site plan showing lot, setbacks, and existing/proposed structures, construction drawings (stamped if required by project type or value), contractor license verification for MSBOC-threshold projects, septic permit receipt if applicable.
  5. Pay applicable fees at time of submission or upon approval.
  6. Receive permit and post on construction site.
  7. Schedule and complete required inspections.
  8. Obtain final approval upon satisfactory final inspection.

Typical processing time: Varies by project complexity; contact Town Hall for estimate.

Source: Town of Mathiston — Town Hall

General Requirements

New building construction within town limits, structural additions or alterations to existing buildings, electrical/plumbing/HVAC and mechanical system installations, roofing with structural component, demolition.

Required Documents

  • Site plan showing lot, setbacks, and existing/proposed structures
  • Construction drawings (stamped if required by project type or value)
  • Contractor license verification for MSBOC-threshold projects
  • Septic permit receipt (if applicable)
Permit validity
Contact Town Hall for permit validity periods.
Building code
The specific building code edition adopted by Mathiston is not publicly documented online. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm the current adopted code and any local amendments.
Contractor requirements
Contractors must hold a valid Mississippi State Board of Contractors (MSBOC) license for projects meeting specified value thresholds.

Fees

Payment note
A published fee schedule for Mathiston building permits is not available online. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net for current fee information. Fees are typically modest for small Mississippi municipalities.

Work That Does NOT Require a Permit

Contact the Town of Mathiston — Town Hall to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • (662) 263-4898 (phone)
  • townofmathiston@maxxsouth.net (email)

Typical inspection sequence: Standard inspection phases: Foundation/Footing Inspection (before concrete pour), Framing/Rough-in Inspection (structural framing and MEP rough-in visible), Final Inspection (all work complete, systems operational). Given Mathiston's small size, inspection services may be provided by a contracted inspector. Confirm upon application.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Town of Mathiston — Town Hall before applying.

Frequently Asked Questions

Town of Mathiston Building Permit FAQ

Do I need a building permit in Town of Mathiston, MS?
New building construction within town limits, structural additions or alterations to existing buildings, electrical/plumbing/HVAC and mechanical system installations, roofing with structural component, demolition.
How do I apply for a building permit in Town of Mathiston, MS?
1. Contact Town Hall at (662) 263-4898 or townofmathiston@maxxsouth.net to confirm permit requirements and applicable zoning for your property. 2. Confirm whether the property is in Webster County or Choctaw County portion of Mathiston. 3. Submit building permit application via online portal (ms.accessgov.com/mathiston/Forms/Page/mathiston/building-permit/), in person at 41 Mathis Drive, or by mail at P.O. Box 178, Mathiston, MS 39752. 4. Prepare required supporting documentation: site plan showing lot, setbacks, and existing/proposed structures, construction drawings (stamped if required by project type or value), contractor license verification for MSBOC-threshold projects, septic permit receipt if applicable. 5. Pay applicable fees at time of submission or upon approval. 6. Receive permit and post on construction site. 7. Schedule and complete required inspections. 8. Obtain final approval upon satisfactory final inspection.
How long does it take to get a building permit in Town of Mathiston, MS?
Typical processing time is Varies by project complexity; contact Town Hall for estimate..
What work is exempt from building permits in Town of Mathiston, MS?
The following work is generally exempt: Cosmetic interior work (painting, flooring, cabinet replacement); Minor repairs not affecting structural elements or systems. Note: Confirm exemptions with Town Hall before proceeding.
How do I schedule a building inspection in Town of Mathiston, MS?
Inspections can be scheduled via: (662) 263-4898, townofmathiston@maxxsouth.net.

Need help with your project?

Navigating permits in Town of Mathiston can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Webster County

View all Webster County jurisdictions →