City Building Permits
Foxworth, MS - 2026 Building Permit Guide
How to apply for a building permit in Foxworth, Mississippi. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Foxworth is an unincorporated census-designated place (CDP) in Marion County. All building permit authority rests with Marion County. This jurisdiction applies to Foxworth and the immediately surrounding unincorporated area.
- Department
- Marion County Board of Supervisors
- Address
- 215 Broad Street, Columbia, MS 39429
- Phone
- 601-736-7382
- Website
- https://www.marioncountyms.com/
Application Process
- Confirm the property is in unincorporated Foxworth area (not within Columbia city limits) using the Tax Assessor or GIS at gis-marioncounty.opendata.arcgis.com.
- Contact the Marion County Board of Supervisors office (601-736-7382) to request permit application forms and confirm current requirements.
- Prepare project documentation: property deed copy, site plan, construction drawings (2 sets recommended).
- For projects over $50,000, ensure contractor holds a valid MSBOC license.
- Submit completed application with supporting documents to the Board of Supervisors office in person.
- Pay applicable permit fees upon approval.
- Obtain permit and schedule required inspections before work begins.
Typical processing time: 1-2 weeks for standard residential projects.
General Requirements
Building permits are required for new residential or commercial construction, additions, alterations, renovations, demolition, electrical/plumbing/mechanical system installation, septic system installation, and any construction in FEMA-designated Special Flood Hazard Areas.
Required Documents
- Completed permit application
- Property deed copy
- Site plan
- Construction drawings (2 sets recommended)
- Contractor license documentation (if project exceeds $50,000)
- Applicant/owner acknowledgements
- Permit validity
- Specific validity periods should be confirmed directly with the Board of Supervisors.
- Building code
- Marion County's building code adoption status is not publicly documented. Contact the Board of Supervisors (601-736-7382) to confirm whether the county has adopted the IBC/IRC and which edition applies.
- Owner-builder
- Owner-builders may apply; confirm any required disclosure forms with the Board of Supervisors.
- Contractor requirements
- Contractors performing residential work over $50,000 or commercial work over $50,000 must hold a valid MSBOC license.
Fees
- Payment note
- Marion County does not publish a fee schedule online. Fees are set by the Board of Supervisors and may be based on construction valuation, square footage, or flat rate per project type. Contact the Board of Supervisors office at 601-736-7382 for current fee amounts.
Work That Does NOT Require a Permit
- Farm buildings and farm structures (exempt from building code requirements under Mississippi Code § 17-2-9; not exempt from floodplain requirements)
Important: Farm building exemptions do not apply in FEMA-designated Special Flood Hazard Areas. Confirm edge cases with the Board of Supervisors before proceeding.
Inspections
How to Schedule
- Marion County Board of Supervisors: 601-736-7382 (phone)
- Scheduling deadline
- Contact the Board of Supervisors directly to schedule inspections.
- Inspection hours
- Monday-Friday, 8:00 AM to 4:00 PM (confirm with Board of Supervisors)
Typical inspection sequence: Typical inspection stages include: pre-construction/site inspection, foundation inspection, framing inspection, systems rough-in inspection (electrical, plumbing, mechanical), and final inspection.
Additional Resources
- Building code: Marion County's building code adoption status is not publicly documented. Contact the Board of Supervisors (601-736-7382) to confirm whether the county has adopted the IBC/IRC and which edition applies.
- Verify contractor license: MSBOC License Lookup
- Mississippi State Board of Contractors (MSBOC)
- Marion County Chancery Clerk (Land Records)
- MSDH Onsite Wastewater (Septic) Permits
- License lookup guide: Mississippi Contractor License Requirements
- Contract template: Mississippi Homeowner-Contractor Agreement
- Mississippi hub: Mississippi Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Marion County Board of Supervisors before applying.
Frequently Asked Questions
Foxworth Building Permit FAQ
- Do I need a building permit in Foxworth, MS?
- Building permits are required for new residential or commercial construction, additions, alterations, renovations, demolition, electrical/plumbing/mechanical system installation, septic system installation, and any construction in FEMA-designated Special Flood Hazard Areas.
- How do I apply for a building permit in Foxworth, MS?
- 1. Confirm the property is in unincorporated Foxworth area (not within Columbia city limits) using the Tax Assessor or GIS at gis-marioncounty.opendata.arcgis.com. 2. Contact the Marion County Board of Supervisors office (601-736-7382) to request permit application forms and confirm current requirements. 3. Prepare project documentation: property deed copy, site plan, construction drawings (2 sets recommended). 4. For projects over $50,000, ensure contractor holds a valid MSBOC license. 5. Submit completed application with supporting documents to the Board of Supervisors office in person. 6. Pay applicable permit fees upon approval. 7. Obtain permit and schedule required inspections before work begins.
- How long does it take to get a building permit in Foxworth, MS?
- Typical processing time is 1-2 weeks for standard residential projects..
- What work is exempt from building permits in Foxworth, MS?
- The following work is generally exempt: Farm buildings and farm structures (exempt from building code requirements under Mississippi Code § 17-2-9; not exempt from floodplain requirements). Note: Farm building exemptions do not apply in FEMA-designated Special Flood Hazard Areas. Confirm edge cases with the Board of Supervisors before proceeding.
- How do I schedule a building inspection in Foxworth, MS?
- Inspections can be scheduled via: Marion County Board of Supervisors: 601-736-7382. Contact the Board of Supervisors directly to schedule inspections..
Need help with your project?
Navigating permits in Foxworth can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Marion County
View all Marion County jurisdictions →