County Building Permits
Iron County, MI - 2026 Building Permit Guide
How to apply for a building permit in unincorporated Iron County, Michigan. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
countywide building and electrical office for Iron County; used for the unincorporated area and for the county jurisdictions that do not maintain a local building enforcing agency.
- Department
- Address
- Iron County Courthouse Annex, 2 South Sixth St., Suite 14, Crystal Falls, MI 49920
- Phone
- (906) 875-3102
- ncurtis@ironmi.org
Application Process
General Requirements
Required Documents
- zoning approval, tax ID/parcels, site map, soil erosion permit or exemption if within 500 feet of water, septic/well permits from Dickinson-Iron Health Department, fire number/address application if needed, building plans, truss/slab specs when applicable, completed application, contractor information, fee payment.
- Building code
- Michigan Building Code and Michigan Residential Code as state baseline; county application and fee materials cite the Stille-DeRossett-Hale State Construction Code Act.
- Owner-builder
- if not self-performing, Iron County says a Michigan licensed contractor must be used.
- Contractor requirements
- license number, expiration date, liability info, address, and phone must be on the application.
Fees
- Minimum permit fee
- $75.00 residential base for work to $1,000; $75.00 commercial administrative base fee
- Plan check fee
- residential plan review and administration base fee $100.00 plus $100.00 for each inspection; commercial plan review $100.00 per hour
Work That Does NOT Require a Permit
- Ordinary repairs only, so long as the work does not involve cutting away walls or structural supports, changing required egress, or altering plumbing, electrical, mechanical, or similar work affecting health or safety.
Inspections
How to Schedule
- call the office or inspector. (phone)
county fee schedule charges for additional inspections and for failure to obtain a permit.
Additional Resources
- Building code: Michigan Building Code and Michigan Residential Code as state baseline; county application and fee materials cite the Stille-DeRossett-Hale State Construction Code Act.
- Zoning information: View zoning info
- County construction code
- State jurisdiction list
- License lookup guide: Michigan Contractor License Requirements
- Contract template: Michigan Homeowner-Contractor Agreement
- Michigan hub: Michigan Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the before applying.
Frequently Asked Questions
Iron County Building Permit FAQ
- How much does a building permit cost in unincorporated Iron County, MI?
- The minimum permit fee is $75.00 residential base for work to $1,000; $75.00 commercial administrative base fee. Plan check fee: residential plan review and administration base fee $100.00 plus $100.00 for each inspection; commercial plan review $100.00 per hour.
- What work is exempt from building permits in unincorporated Iron County, MI?
- The following work is generally exempt: Ordinary repairs only, so long as the work does not involve cutting away walls or structural supports, changing required egress, or altering plumbing, electrical, mechanical, or similar work affecting health or safety..
- How do I schedule a building inspection in unincorporated Iron County, MI?
- Inspections can be scheduled via: call the office or inspector..
Need help with your project?
Navigating permits in Unincorporated Iron County can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector works