City Building Permits
Havana, IL - 2026 Building Permit Guide
How to apply for a building permit in Havana, Illinois. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
City limits of Havana
- Department
- Havana Zoning Department
- Address
- City Hall, 227 West Main Street, Havana, IL 62644
- Phone
- 309-543-2153
- m.fliege@havanail.gov
Application Process
- Determine whether the project is one of the listed permit triggers.
- Complete the building permit application PDF.
- Include site drawing, setbacks, project description, and for new construction in C-1 and above, stamped prints.
- Submit electronically or print and contact zoning.
- Property must be inspected by the zoning officer before issuance.
- Follow up after electronic submission if requested.
Source: Havana Zoning Department
General Requirements
roofing projects, footprint changes, structures over 100 sq. ft., fences, decks, patios, pergolas, and other listed work.
Required Documents
- completed application, site sketch, project details, contractor and license info where relevant, and stamped prints for C-1 and above new construction.
- Building code
- Havana states it adopted the 2018 edition of the International Building Code, 2011 NEC, Life Safety Code 2001, IECC, and Illinois Accessibility Code 2018 on the zoning page; the permit form also references the 2020 ICC edition. The public pages conflict, so this should be verified directly with the city before design work.
- Owner-builder
- form allows owner applicant; no separate public owner-builder policy found.
- Contractor requirements
- roofing or plumbing license required on the form where applicable; the form also asks for insurance policy information for roofing and plumbing work.
Fees
- Minimum permit fee
- $20 for awnings; $30 minimum for residential R-1/R-2 and commercial work up to $5,000
- Plan check fee
- not separately stated
- Permit fee formula
- over $100,000.01, fee is $220 plus $1 per $1,000 of construction cost over $100,000
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Concrete pads and driveways are not included in the permit process, though runoff rules still apply
Inspections
How to Schedule
- contact zoning department by phone or email to make an appointment for inspection and approval (online)
- Inspection hours
- city hall hours are not clearly listed on the zoning page; general site shows city administration contact during normal business hours
Typical inspection sequence: application, property inspection, then permit issuance
Additional Resources
- Building code: Havana states it adopted the 2018 edition of the International Building Code, 2011 NEC, Life Safety Code 2001, IECC, and Illinois Accessibility Code 2018 on the zoning page; the permit form also references the 2020 ICC edition. The public pages conflict, so this should be verified directly with the city before design work.
- Zoning information: View zoning info
- City contact directory
- City ordinances
- GIS zoning map
- License lookup guide: Illinois Contractor License Requirements
- Contract template: Illinois Homeowner-Contractor Agreement
- Illinois hub: Illinois Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Havana Zoning Department before applying.
Frequently Asked Questions
Havana Building Permit FAQ
- Do I need a building permit in Havana, IL?
- roofing projects, footprint changes, structures over 100 sq. ft., fences, decks, patios, pergolas, and other listed work.
- How much does a building permit cost in Havana, IL?
- The minimum permit fee is $20 for awnings; $30 minimum for residential R-1/R-2 and commercial work up to $5,000. Fees are calculated as: over $100,000.01, fee is $220 plus $1 per $1,000 of construction cost over $100,000. Plan check fee: not separately stated.
- How do I apply for a building permit in Havana, IL?
- 1. Determine whether the project is one of the listed permit triggers. 2. Complete the building permit application PDF. 3. Include site drawing, setbacks, project description, and for new construction in C-1 and above, stamped prints. 4. Submit electronically or print and contact zoning. 5. Property must be inspected by the zoning officer before issuance. 6. Follow up after electronic submission if requested.
- What work is exempt from building permits in Havana, IL?
- The following work is generally exempt: Concrete pads and driveways are not included in the permit process, though runoff rules still apply.
- How do I schedule a building inspection in Havana, IL?
- Inspections can be scheduled via: contact zoning department by phone or email to make an appointment for inspection and approval.
Need help with your project?
Navigating permits in Havana can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Mason County
View all Mason County jurisdictions →