City Building Permits

Centerville, GA - 2026 Building Permit Guide

How to apply for a building permit in Centerville, Georgia. Permit authority, application steps, fees, and inspection requirements.

Georgia Houston County Updated March 2026

Permit Authority

Issues permits within the City of Centerville

Department
City of Centerville Building Inspections Department
Address
300 E. Church Street, Centerville, GA 31028
Phone
Building Inspector John Burt: (478) 953-7871 ext. 242; City Clerk: (478) 953-4734

Application Process

  1. Contact the Building Inspections Department if the permit trigger is unclear
  2. Download the construction permit application or roofing permit application from the city site
  3. Submit the application and plans to the City Clerk office / Building Inspector at 300 E. Church Street
  4. Obtain review and approval from the Centerville Building Inspector and Utilities Superintendent before permit issuance
  5. Pay the required permit fees
  6. Schedule inspections through City Hall / Building Inspections during construction

Typical processing time: Site plan review can take about two weeks for basic review and up to 45 days when stormwater review is required

Source: City of Centerville Building Inspections Department

General Requirements

New residential and commercial construction, additions and alterations, miscellaneous changes and repairs or total replacement of electrical, plumbing, and HVAC systems, installation or relocation of mobile homes in approved parks, and swimming pools

Required Documents

  • Permit application
  • Building plans
  • Contractor information
  • Utilities review materials needed for the Utilities Superintendent
  • For sign permits: colored rendering, dimensions, and site plan for freestanding signs
Building code
Building Inspection Department enforces the city's construction codes. No separate current local code-adoption ordinance was located; Georgia state minimum construction codes apply at minimum
Owner-builder
Building codes apply whether work is completed by a hired contractor or private homeowner
Contractor requirements
Application forms request state license information for general, plumbing, electrical, and HVAC contractors; Georgia state licensing rules apply

Fees

Minimum permit fee
$10.00 administrative fee
Permit fee formula
Mixed. Sign permit fees are based on a percentage of construction cost; multiple permit-specific charges by type
Payment note
Electronic payment processing fee: $1.80 per payment (effective August 7, 2023; non-refundable)

Fees change. Verify current amounts at the official fee schedule (effective 2020).

Work That Does NOT Require a Permit

Contact the City of Centerville Building Inspections Department to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • ()
  • ()
Inspection hours
Monday through Friday, 8:00 a.m. to 5:00 p.m.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the City of Centerville Building Inspections Department before applying.

Frequently Asked Questions

Centerville Building Permit FAQ

Do I need a building permit in Centerville, GA?
New residential and commercial construction, additions and alterations, miscellaneous changes and repairs or total replacement of electrical, plumbing, and HVAC systems, installation or relocation of mobile homes in approved parks, and swimming pools
How much does a building permit cost in Centerville, GA?
The minimum permit fee is $10.00 administrative fee. Fees are calculated as: Mixed. Sign permit fees are based on a percentage of construction cost; multiple permit-specific charges by type.
How do I apply for a building permit in Centerville, GA?
1. Contact the Building Inspections Department if the permit trigger is unclear 2. Download the construction permit application or roofing permit application from the city site 3. Submit the application and plans to the City Clerk office / Building Inspector at 300 E. Church Street 4. Obtain review and approval from the Centerville Building Inspector and Utilities Superintendent before permit issuance 5. Pay the required permit fees 6. Schedule inspections through City Hall / Building Inspections during construction
How long does it take to get a building permit in Centerville, GA?
Typical processing time is Site plan review can take about two weeks for basic review and up to 45 days when stormwater review is required.
How do I schedule a building inspection in Centerville, GA?
Inspections can be scheduled via: , .

Need help with your project?

Navigating permits in Centerville can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.