County Building Permits

Glynn County, GA - 2026 Building Permit Guide

How to apply for a building permit in unincorporated Glynn County, Georgia. Permit authority, application steps, fees, and inspection requirements.

Georgia Updated March 2026

Permit Authority

Applies in unincorporated Glynn County outside the City of Brunswick

Department
Building Permitting and Inspections
Address
1725 Reynolds Street, Suite 200, Brunswick, GA 31520
Phone
912-554-7456

Online Permit Portal

Platform: OpenGov Citizen Services • Account required: Yes • Submission: Online only

Additional resources:

Application Process

  1. Apply through Glynn County's Citizen Services / OpenGov portal for building, planning, or engineering services applications
  2. Upload the required attachments as part of the application package
  3. County reviewers check the package for compliance with state and county regulations and will request resubmittal if items are noncompliant
  4. Once all reviewers determine the package is compliant, the application is approved; some related applications require public hearings before approval
  5. Fees and approval letters are handled through OpenGov; after permit issuance, inspections are scheduled by phone with the Building Department and a certificate of occupancy is issued after all inspections and required paperwork/forms are complete

Source: Building Permitting and Inspections

General Requirements

New Construction and Additions, Structural Changes, Change in Building Use, Outdoor Structures and Site Work, Demolition and Removal, Specialized Installations, and Trade Work

Required Documents

  • Application package with required attachments through OpenGov
  • Elevation certificates for floodplain projects
  • For manufactured/mobile homes: septic tank permit, driveway/culvert permit, tax decal, home make/year/value/size information
Building code
International Building Code 2024, International Residential Code 2024, International Fire Code 2024, International Plumbing Code 2024, International Mechanical Code 2024, International Fuel Gas Code 2024, International Energy Conservation Code 2015, International Swimming Pool and Spa Code 2024, National Electrical Code 2023, as mandated and amended by Georgia; 2026 Georgia amendments effective January 1, 2026
Owner-builder
Owner-performed work allowed; confirm directly with the department regarding home owner affidavit requirements
Contractor requirements
For manufactured/mobile home setup, the setup contractor must be licensed by both the State of Georgia and Glynn County; Georgia state licensing rules apply to residential contracting above the state threshold

Fees

Payment note
Planning and zoning application fees are paid only through OpenGov and approval letters are issued only within OpenGov; the county does not email invoices or request payment by email

Work That Does NOT Require a Permit

Contact the Building Permitting and Inspections to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • ()
Inspection hours
Monday through Friday, 8:00 AM to 4:00 PM (phones open until 4:30 PM)
Time windows

Typical inspection sequence: Common stages: footing before concrete, slab before pour, rough-in before drywall, permanent power between rough-in and final, and final after building, plumbing, electrical, HVAC, driveway/culvert, house number, landscaping, and soil erosion measures are complete; certificate of occupancy issued after all inspections and required paperwork/forms are complete

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Permitting and Inspections before applying.

Frequently Asked Questions

Glynn County Building Permit FAQ

Do I need a building permit in unincorporated Glynn County, GA?
New Construction and Additions, Structural Changes, Change in Building Use, Outdoor Structures and Site Work, Demolition and Removal, Specialized Installations, and Trade Work
How do I apply for a building permit in unincorporated Glynn County, GA?
1. Apply through Glynn County's Citizen Services / OpenGov portal for building, planning, or engineering services applications 2. Upload the required attachments as part of the application package 3. County reviewers check the package for compliance with state and county regulations and will request resubmittal if items are noncompliant 4. Once all reviewers determine the package is compliant, the application is approved; some related applications require public hearings before approval 5. Fees and approval letters are handled through OpenGov; after permit issuance, inspections are scheduled by phone with the Building Department and a certificate of occupancy is issued after all inspections and required paperwork/forms are complete
How do I schedule a building inspection in unincorporated Glynn County, GA?
Inspections can be scheduled via: .

Need help with your project?

Navigating permits in Glynn County (Unincorporated) can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.
← Back to Glynn County permit guides