Middletown, CT - 2026 Building Permit Guide
How to apply for a building permit in Middletown, Connecticut. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
City permit authority for Middletown properties; building is housed within Public Works and coordinates with planning and other city reviewers.
- Department
- Building Division
- Address
- 245 deKoven Drive, 2nd Floor, Middletown, CT 06457
- Phone
- 860-638-4870
Online Permit Portal
Platform: City-hosted online building permit system • Account required: Yes • Submission: In-person only
Application Process
- Download or complete the permit application through the Building Division page or online system.
- Submit plans, required paperwork, and payment; projects needing plans are not reviewed until drawings and paperwork are received.
- If applying on behalf of a contractor, include CT Form 7A as required by the city.
- Wait for permit issuance; permits must be fully paid and issued before inspections can be scheduled.
- Call the office to schedule inspections directly with staff.
Typical processing time: Inspection scheduling runs 7 to 10 days out, and sometimes 2 or more weeks in summer
Source: Building Division
General Requirements
New construction, renovations, alterations, remodeling, demolition, and related building or trade work; city also posts a separate handout for work exempt from permits.
Required Documents
- Permit application
- plans where required
- payment
- CT Form 7A or 7B where applicable
- and permit-specific checklists.
- Building code
- Connecticut State Building Code enforced by the city.
- Owner-builder
- CT Form 7B is posted on the department page
- Contractor requirements
- City expects contractor information and uses CT Form 7A when someone else pulls the permit for the contractor
Fees
- Minimum permit fee
- See UPDATED Permit Fees handout on department page
- Plan check fee
- See department fee handout and plan review checklist
- Permit fee formula
- Posted in the UPDATED Permit Fees handout
- Reinspection fee
- $75 after two failed inspections of the same portion of the job, due before a third reinspection is scheduled
- Payment note
- Payment must be received before review and before inspection scheduling
Fees change. Verify current amounts at the official fee schedule (effective 2026-03).
Work That Does NOT Require a Permit
- City posts a separate "Work exempt from permits" handout on the Building Division page.
Inspections
How to Schedule
- 860-638-4870 (phone)
- Inspection hours
- Office hours Monday through Friday, 7:00 a.m. to 4:30 p.m.
Typical inspection sequence: Permit issuance, required progress inspections, final inspection, then CO where applicable
$75 reinspection fee after two failures of the same work segment
Additional Resources
- Building code: Connecticut State Building Code enforced by the city.
- Zoning information: View zoning info
- License lookup guide: Connecticut Contractor License Requirements
- Contract template: Connecticut Homeowner-Contractor Agreement
- Connecticut hub: Connecticut Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Division before applying.
Frequently Asked Questions
Middletown Building Permit FAQ
- Do I need a building permit in Middletown, CT?
- New construction, renovations, alterations, remodeling, demolition, and related building or trade work; city also posts a separate handout for work exempt from permits.
- How much does a building permit cost in Middletown, CT?
- The minimum permit fee is See UPDATED Permit Fees handout on department page. Fees are calculated as: Posted in the UPDATED Permit Fees handout. Plan check fee: See department fee handout and plan review checklist.
- How do I apply for a building permit in Middletown, CT?
- 1. Download or complete the permit application through the Building Division page or online system. 2. Submit plans, required paperwork, and payment; projects needing plans are not reviewed until drawings and paperwork are received. 3. If applying on behalf of a contractor, include CT Form 7A as required by the city. 4. Wait for permit issuance; permits must be fully paid and issued before inspections can be scheduled. 5. Call the office to schedule inspections directly with staff.
- How long does it take to get a building permit in Middletown, CT?
- Typical processing time is Inspection scheduling runs 7 to 10 days out, and sometimes 2 or more weeks in summer.
- What work is exempt from building permits in Middletown, CT?
- The following work is generally exempt: City posts a separate "Work exempt from permits" handout on the Building Division page..
- How do I schedule a building inspection in Middletown, CT?
- Inspections can be scheduled via: 860-638-4870.